My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-22-18_AGENDA PACKET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2018
>
10-22-2018
>
10-22-18_AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 2:06:57 PM
Creation date
8/16/2019 2:01:04 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution No. 2018-xx <br />Conditions for Approval for Site Plan Review No. 2018-02 <br /> <br />Site Plan Review No. 2018-02 is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Manager, with applicable sections of the Santa Ana Municipal <br />Code, the California Administrative Code, the California Building Standards Code, and all <br />other applicable regulations. In addition, it shall meet the following conditions of approval: <br /> <br />The Applicant or Owner, or Owner’s successor(s) or assignee(s) (collectively, “Applicant”) <br />with the City’s consent, which shall not be unreasonably withheld, must comply with each <br />and every condition listed below prior to exercising the rights conferred by this site plan <br />review. <br /> <br />The Applicant must remain in compliance with all conditions listed below throughout the <br />life of the development project. Failure to comply with each and every condition may result <br />in the revocation of the site plan review. <br /> <br />A. Planning Division <br /> <br />1. All proposed site improvements must conform to the Development Project Review <br />approval of DP No. 2017-06. <br /> <br />2. The approved Development is as follows: A mixed-use development project <br />consisting of 603 residential and live/work units and 8,530 square feet of <br />commercial area and 1,209 parking spaces. Specifically, the project will include <br />310 residential units and seven live/work units in one building and 293 residential <br />units in the other. The buildings will be five and seven stories in height and will <br />consists of approximately 49.6-percent one- and two-bedroom units and 50.4- <br />percent two- and three-bedroom units. The Elan project is comprised of two <br />buildings, the first with seven stories and the second with five. Open space will be <br />provided at 100 square feet per unit, with publicly-accessible open space ranging <br />from 18 percent (Building 2) to 23 percent (Building 1). The publicly-accessible <br />open space shall be a large street-level courtyard between the two buildings on the <br />project site. The courtyard shall contain a large lawn, forest walk, pavilion, dog <br />area, boardwalks, bike racks, and a drop-off area for the community and public. <br />The courtyard will be surrounded by an artist gallery, leasing office, and other <br />community amenities. Additional open space on site will serve the residents and <br />tenants within the community. Amenity rooms, decks and balconies, two pool <br />areas and private courtyards, and view rooms will also be provided at a rate of 100 <br />square feet per unit. <br />· <br />3. The Applicant shall agree to all recommendations contained within the required <br />technical studies and reports prepared for the project. All studies and reports shall <br />be finalized by the Applicant and approved by the City of Santa Ana prior to <br />issuance of building permits. <br /> <br /> <br />1-8
The URL can be used to link to this page
Your browser does not support the video tag.