My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-14-19_AGENDA PACKET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
01-14-19
>
01-14-19_AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:02:30 PM
Creation date
8/16/2019 3:57:32 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Resolution No. _____ Page 43 of 71 <br />Certification of the Magnolia at the Park EIR <br /> <br />to maintain acceptable service ratios, response times or other performance objectives for police <br />protection? <br /> <br />Finding: Less than significant impact. (DEIR, p. 4.10-8 through 4.10-9.) <br />Facts in Support of Finding: The Project would result in an incremental increase in demands on law <br />enforcement services but would not be significant when compared to the current demand levels. The <br />residential population of the Project would be approximately 0.27 percent of the City’s population and <br />based on the Police Department’s 2016 staffing of 1.04 officers per thousand population, the Project would <br />require less than one additional officer. In addition, the Police Department headquarters are 2.5 miles from <br />the Project and within response distance. Furthermore, typical police operations within the Department’s <br />Northeast District deploys coverage to be able to respond to calls from services throughout the area. The <br />addition of one officer on patrol would not require the construction or expansion of the City’s existing <br />policing facilities. Therefore, the Project would not result in the need for new or physically altered police <br />protection facilities. <br /> <br />For the reasons discussed above and the reasons discussed in the DEIR, impacts associated with this issue <br />would be less than significant, and no mitigation is required. (DEIR, p. 4.10-8 through 4.10-9.) <br /> <br />9.14.3 Education <br /> <br />Threshold: Would the Project result in substantial adverse physical impacts associated with the <br />provision of new or physically altered governmental facilities, or a need for new or physically altered <br />governmental facilities, the construction of which could cause significant environmental impacts, in order <br />to maintain acceptable service ratios, response times or other performance objectives for schools? <br /> <br />Finding: Less than significant impact. (DEIR, p. 2-8; Initial Study, p. 54.) <br />Facts in Support of Finding: As described in the Initial Study, the Project is required to pay fees for the <br />provision of school services pursuant to state law AB 2926. This fee would contribute to a fund that would <br />pay for new or expanded buildings, faculty, or equipment. Under state law, payment of school impact fees <br />constitutes mitigation for school facility impacts of projects and such payments are deemed to provide full <br />and complete school facilities mitigation. (Initial Study, p. 54.) <br /> <br />For the reasons discussed above and the reasons discussed in the DEIR and Initial Study, impacts <br />associated with this issue would be less than significant, and no mitigation is required. (Initial Study, p. <br />54.) <br /> <br />9.14.4 Parks <br /> <br />Threshold: Would the Project result in substantial adverse physical impacts associated with the <br />provision of new or physically altered governmental facilities, or a need for new or physically altered <br />governmental facilities, the construction of which could cause significant environmental impacts, in order <br />to maintain acceptable service ratios, response times or other performance objectives for parks? <br /> <br />Finding: Less than significant impact. (DEIR, p. 4.10-12 through 4.10-13.) <br />Facts in Support of Finding: As described in Section 3.0, Project Description, the Project includes <br />34,300 square feet of onsite exterior open space and recreation facilities that includes 5 recreation <br />courtyard areas that total 22,900 square feet and an 11,400-square foot amenity deck on the roof of the <br />2-79
The URL can be used to link to this page
Your browser does not support the video tag.