My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-14-19_AGENDA PACKET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
01-14-19
>
01-14-19_AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:02:30 PM
Creation date
8/16/2019 3:57:32 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2525 N. Main Street Magnolia at the Park Multi-Family Residential Project Mitigation Monitoring and Reporting Program <br /> <br /> <br />City of Santa Ana 3 <br />November 2018 <br />Required Measure Implementation Timing <br />Responsible for <br />Ensuring Compliance / <br />Verification <br />Date <br />Completed <br />and Initials <br />clean cuts. No pruning paint or sealants shall be used. <br />• Any grade changes near the preserved trees or pruning of trees to provide clearances for <br />construction equipment shall be coordinated with a Registered Consulting Arborist before <br />construction begins, and precautions pursuant to the arborist’s recommendations shall be taken <br />to mitigate potential tree injuries. <br />• Prior to construction, a one-pound soil sample shall be taken from the top 18-inches of soil in <br />each area where trees will be preserved. The samples shall be sent to an appropriate <br />laboratory for analysis and soil supplement recommendations. Fertilization of the preserved <br />trees shall be completed pursuant to the laboratory analysis’ soil supplement <br />recommendations. <br />• Prior to construction, augur 6-inch diameter holes about 3 feet deep at a 3-foot spacing <br />between large roots in the more compacted and crowded spaces. Avoid large visible roots, <br />relocating the holes as needed. Start augur holes at three times the trunk diameter, i.e. 6-feet <br />from a 24-inch tree. Back fill with amended soil, based on an agronomic lab’s testing and <br />recommendations. <br />• Prior to construction, mulch all exposed soil areas using a topical application of a well- <br />composted, coarse-texture mulch, without manure or bio-solids, e.g. Aguinaga Forest Floor ½ <br />to 1½” particle size. Apply it 2-inches deep, but not against the tree trunks. <br />• Deep water before construction and check soil moisture monthly during construction by means <br />of a soil test probe. Slow water with a soaker hose or water spike for 12 hours, or as long as <br />necessary to reach 4-feet deep. <br />• Rinse tree foliage at the end of each work week, using a strong stream of water from a high- <br />pressure nozzle. <br />• During construction in areas without pavement near the preserved trees, 3 or more inches of <br />coarse mulch or tree chips under 1-inch plywood for light vehicle parking and steel plates for <br />larger vehicles is required to prevent compaction and protect surface roots. <br />• Protection Barrier: A protection barrier shall be installed around the trees to be preserved. The <br />barrier shall be constructed of durable fencing material, such as chain link fencing. The barrier <br />shall be placed as far from the base of the tree(s) as possible and shall be maintained in good <br />repair throughout the duration of construction, and shall not be removed, relocated, or <br />encroached upon without permission of the project arborist. <br />o Storage of Materials: There shall be NO storage of materials or supplies of any kind within <br />the area of the protection barriers. Concrete and cement materials, block, stone, sand and <br />soil shall not be placed within the drip-line of the tree. <br />2-110
The URL can be used to link to this page
Your browser does not support the video tag.