My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-14-19_AGENDA PACKET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
01-14-19
>
01-14-19_AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:02:30 PM
Creation date
8/16/2019 3:57:32 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring and Reporting Program 2525 N. Main Street Magnolia at the Park Multi-Family Residential Project <br /> <br /> <br />City of Santa Ana 8 <br />November 2018 <br />Required Measure Implementation Timing <br />Responsible for <br />Ensuring Compliance / <br />Verification <br />Date <br />Completed <br />and Initials <br />provided during the submittal of plans to demonstrate compliance with all codes and other regulations <br />governing water availability for firefighting and emergency access to the project site and structures that <br />shall be reviewed by the Orange County Fire Authority. <br />Specifications. Prior to Building <br />Permits <br />Municipal Code Chapter 14, Fire Code: New structures shall meet all California Fire Code standards. In Development Plans. Prior to <br />Building Permits <br />City of Santa Ana Building and <br />Safety Division <br />Orange County Fire Authority <br /> <br />Municipal Code Chapter 8-46, Fire Facilities Fee: The fire facilities fee shall be paid prior to the <br />issuance of building permit for construction of buildings. All fire facility fee revenues shall be expended <br />solely to fund equipment needed to fight fires in buildings over 2 stories in height and to improve fire <br />stations to accommodate such equipment. <br />Prior to Building Permits City of Santa Ana Building and <br />Safety Division <br /> <br />Municipal Code Sections 35-108, 35-110, and 35-111 Park and Recreation Fees: The park and <br />recreation fees shall be paid prior to the issuance of building permit for construction of buildings. The <br />park and recreation fee revenues shall be expended solely to fund the acquisition, construction, and <br />renovation of park and recreation facilities based on a standard of 2 acres of public park and/or <br />recreational space per 1,000 residents. <br />Prior to Building Permits City of Santa Ana Building and <br />Safety Division <br /> <br />Tribal Cultural Resources <br />Mitigation Measure TCR-1: Inadvertent Discoveries. The project’s grading and construction plans <br />and specifications shall state that prior to commencement of any excavation activities, a Native <br />American shall be contacted to conduct a Native American Indian Sensitivity Training for construction <br />personnel. The training session includes a handout and focus on how to identify Native American <br />resources encountered during earthmoving activities and the procedures followed if resources are <br />discovered. <br />In the event that tribal cultural resources are inadvertently discovered during ground-disturbing <br />activities, work must be halted within 50 feet of the find until it can be evaluated by a qualified <br />archaeologist in cooperation with a Native American monitor to determine if the potential resource meet <br />the CEQA definition of historical (State CEQA Guidelines 15064.5(a)) and/or unique resource (Public <br />Resources Code 21083.2(g)). Construction activities could continue in other areas. <br />If the find is considered a “resource” the archaeologist, in cooperation with a Native American monitor <br />shall pursue either protection in place or recovery, salvage and treatment of the deposits. Recovery, <br />salvage and treatment protocols shall be developed in accordance with applicable provisions of Public <br />Resource Code Section 21083.2 and State CEQA Guidelines 15064.5 and 15126.4. If unique a tribal <br />cultural resource cannot be preserved in place or left in an undisturbed state, recovery, salvage and <br />treatment shall be required at the project applicant’s expense. All recovered and salvaged resources <br />shall be prepared to the point of identification and permanent preservation in an established accredited <br />In Grading and Construction Plans <br />and Specifications. Prior to <br />Grading Permits <br />City of Santa Ana Building and <br />Safety Division <br /> <br />2-115
The URL can be used to link to this page
Your browser does not support the video tag.