Laserfiche WebLink
2525 North Main Street  <br />January 14, 2019  <br />Page 21  <br />  <br />Envisioning Map  <br />Early in the General Plan update process (late 2015/early 2016) Planning Division staff drafted an  <br />envisioning map which identified study areas and areas that could potentially have an increase in  <br />development, density and building heights. The North Main Street corridor (north of 17th Street)  <br />including the subject property was identified as an area that may be considered for high‐rise  <br />development and unlimited density. The map did not go through a formal adoption process and  <br />included a note that, "The map represents a conceptual effort and its contents are in a draft  <br />format and do not represent any formal efforts to rezone or redesignate properties shown." As  <br />mentioned  previously,  the  North  Main  Street  area  is  still  being analyzed as part of the  <br />comprehensive General Plan update.  <br />Cumulative Impacts  <br />As part of the EIR a list of cumulative projects was drafted including projects in the vicinity within  <br />the City of Santa Ana and City of Orange for which development applications were submitted,  <br />approved and/or under construction at or prior to the release of the NOP. The project list includes  <br />39  commercial  and  residential  projects.  Key topics  raised  or  commented  on  relative  to  the  <br />cumulative impacts were population and traffic among others that are analyzed in the EIR.  <br />The Persons Per Household Evaluation within the EIR determined that the number of persons per  <br />dwelling unit is anticipated to be 1.6 per studio, 1.6 per one‐bedroom, 2.7 per two‐bedroom and  <br />3.9 per three‐bedroom which with the applicant's proposed project would be 955 residents. In  <br />addition, 1 ,236 multi‐family units are proposed within the City of Santa Ana and 3,324 multifamily  <br />units within the City of Orange (5,056 units total). The total cumulative housing growth from all  <br />of the projects listed equals 7.4 percent, which is consistent with SCAG's growth estimates of 8.4  <br />percent increase.  <br />In 2020, the project and cumulative projects are anticipated to generate 4,306 a.m. peak hour  <br />trips, 4,359 p.m. peak hour trips, and 49,842 daily trips. In 2020, with the cumulative project trips,  <br />all study area intersections are forecast to operate at satisfactory levels of service, except for the  <br />Main Street/Santa Clara/l‐5 northbound on ramp and the SR‐22 eastbound ramps at Town and  <br />Country Road in both the a.m. and p.m. peak hours. However, the SR‐22 eastbound ramps at  <br />Town and Country Road also operate at unsatisfactory conditions under existing conditions. In  <br />2040, the intersections are anticipated to operate at an unsatisfactory level of service with or  <br />without the project.  <br />Impacts to Public Services  <br />Section 4.10 of the Draft EIR analyzed the impacts of the project on fire service, police service and  <br />parks and recreation service. CEQA focuses on the physical effects of the project (i.e. new or  <br />expanded facilities), therefore an increase in staffing or calls for service would not, by itself, be  <br />considered a physical change in the environment. As proposed the project would result in a less  <br />than significant impact to public services.  <br />Commented [DH70]: Still can’t believe this  <br />is even being mentioned.  The Envision Map  <br />is not an approved City document.  A parcel  <br />of land that is located across the street from  <br />2525, and is less than 8000 square feet, is  <br />also listed as a site for “Highrise (unlimited  <br />density)”.  <br />Commented [DH71]: This is a fair warning  <br />to anyone wishing to use this map.  <br />Commented [DH72]: What is missing is the  <br />Main Place Transformation Project.  The City  <br />has restricted the scope of the r2525 EIR to  <br />development applications that were  <br />submitted, approved and/or under  <br />construction at or prior to the release of the  <br />NOP.  CEQA 15130. DISCUSSION OF  <br />CUMULATIVE IMPACTS requires either a list  <br />of past, present, and probable future projects  <br />producing related or cumulative impacts,  <br />including, if necessary, those projects outside  <br />the control of the agency, or A summary of  <br />projections contained in an adopted local,  <br />regional or statewide plan, or related  <br />planning document, that describes or  <br />evaluates conditions contributing to the  <br />cumulative effect.   <br />  <br />The Main Place EIR was approved in the  <br />1990’s and is a known project.  The fact that  <br />the new owner submitted a plan in May 2018  <br />is irrelevant.  The Main Place EIR did not  <br />evaluate the 2525 N. Main Residential  <br />Development.  And the 2525 N. Main  <br />Residential Development EIR did not ... [3] <br />Commented [DH73]: From the Magnolia  <br />At The Park Website:  There will be:  <br />•  a maximum of 2 residents allowed in  <br />studios and one‐bedroom units,   <br />•  a maximum of 4 residents in two bedroom  <br />units, and  <br />•  a maximum of 5 residents in  <br />three bedroom units.  <br />  ... [4] <br />Commented [DH74]: Over 1500 of these  <br />units are slated for the areas south of the SR‐ <br />22 and North of I‐5 (within 0.5 miles of 2525  <br />N. Main St.) BEFORE you even count the 496  <br />units for this project and BEFORE the  <br />1900 units at Main Place are considered.     <br />Commented [DH75]: Its already  <br />unsatisfactory so we shouldn’t worry about  <br />it.  What is not mentioned is the EIR also  <br />states that for the 15 surrounding freeway  <br />intersections during the peak times (a.m. and  <br />p.m.) the CURRENT grade for these 22 of the  <br />30 data points is a failing grade.