My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4 -CUP19-01; ME19-01_4405 W EDINGER
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
01-28-19
>
4 -CUP19-01; ME19-01_4405 W EDINGER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:16:48 PM
Creation date
8/16/2019 4:15:53 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11738-02 Letter.docx <br />Ms. Selena Kelaher <br />City of Santa Ana <br />June 19, 2018 <br />Page 4 of 8 <br />Opening Year (2019) Without Project conditions intersection analysis worksheets are provided in <br />Attachment C. <br />OPENING YEAR (2019) WITH CONDITIONS <br />TRAFFIC FORECASTS <br />The Project trips that have been calculated at each of the study area intersections based on the trips <br />generated by the Project shown on Table 2 and were added to Opening Year (2019) Without <br />background traffic to calculate Opening Year (2019) With Project traffic volumes for each of the Project <br />alternatives. Opening Year (2019) With Project weekday and Sunday peak hour traffic volumes are <br />shown on the following exhibits: <br />•Exhibit 9: Alternative 1 (109 new seats in the mezzanine of the existing sanctuary) <br />•Exhibit 10: Alternative 2 (Construction of a new 9,928 square foot Community Service Building) <br />•Exhibit 11: Alternative 3 Total Project <br />INTERSECTION OPERATIONS ANALYSIS <br />ALTERNATIVE 1: MEZZANINE ONLY <br />A summary of intersection operations analysis results for Opening Year (2019) With Project (Mezzanine <br />Only) traffic conditions is shown in Table 3. As shown in Table 3, the following study area intersection is <br />anticipated to continue operate at an unacceptable LOS under Opening Year (2019) With Project traffic <br />conditions: <br />•Newhope Street & Edinger Avenue (#1) – LOS E PM peak hour only <br />Opening Year (2019) With Project (Mezzanine Only) conditions intersection analysis worksheets are <br />provided in Attachment D. <br />ALTERNATIVE 2: COMMUNITY SERVICE BUILDING ONLY <br />A summary of intersection operations analysis results for Opening Year (2019) With Project (Community <br />Service Building Only) traffic conditions is shown in Table 5. As shown in Table 5, the following study area <br />intersection is anticipated to continue operate at an unacceptable LOS under Opening Year (2019) With <br />Project traffic conditions: <br />•Newhope Street & Edinger Avenue (#1) – LOS E PM peak hour only <br />Opening Year (2019) With Project (Community Service Building Only) conditions intersection analysis <br />worksheets are provided in Attachment F. <br />4-122
The URL can be used to link to this page
Your browser does not support the video tag.