ARCHANGEL MICHAEL COPTIC ORTHODOX CHURCH <br />COMMUNITY SERVICE BUILDING PROJECT <br />4405 W EDINGER AVE, SANTA ANA, CA 92704 <br /> <br /> 8 <br />45848142;1 <br />the Community Service Building. Accordingly, a Minor Exception to allow an 20 percent (5-½ <br />foot) increase in height for portions of the Community Service Building’s roof to extend up to <br />32-½ feet in height is being requested. The Code permits Minor Exception Modifications so <br />long as the height is not exceed by more than twenty-five (25) per cent of the maximum height <br />permitted. SAMC §§ 41.632.(a)(3)(d). All other aspects of the Project’s design comply with <br />Code standards. <br /> <br />A central courtyard with decorative features, paving, and landscaping will separate the <br />Community Service Building from the Church. A pedestrian walkway and accessible paths of <br />travel will be provided around the Church and Community Service Building providing easy paths <br />of travel from the parking areas to the buildings and to Edinger Avenue. The parking area and <br />the perimeter the Site will be landscaped with a variety of trees, turf, ornamental plants and <br />drought tolerant plants. Approximately 25-percent of the Project Site will be landscaped, <br />resulting in more than 26,500 square feet (0.66 acres) of landscaping. In addition to the <br />landscaping, new walls and fences will be installed along the perimeter of the Project Site <br />where the existing residences are being demolished. Once completed, the frontages along the <br />Regent Drive and Gates Street will have a new six-foot tall block wall, as well as be improved <br />with drought tolerant landscaping and irrigation, in addition to new trees. Along the eastern <br />property boundaries with the adjacent existing residential neighbors, an eight-foot block wall is <br />proposed, at the request of the neighbors. The frontage will be landscaped with turf, drought <br />tolerant landscaping, and trees as requested by the City. <br /> <br />Access on to the Project Site will be available via two two-way driveways on Edinger Avenue. <br />The existing two-way driveway onto the Site will remain in its current location. A second two- <br />way driveway will be constructed to the east of the Church. Overall, the primary focus of the <br />design of the access driveways, internal drive aisles and the parking areas was to allow a <br />cohesive vehicular patterns and movement across the Site and allow vehicles to enter and exit <br />safely and timely. <br /> <br />A Focused Traffic Assessment was completed by Urban Crossroads on June 19, 2018 for the City <br />of Santa Ana. The purpose of the assessment was to identify potential traffic impacts resulting <br />from the development of the proposed Project. Urban Crossroads' study concluded that the <br />Project would have less than significant impacts at all intersections and under all scenarios and <br />determined that no mitigation is required. On Monday, July 9, 2018 the City of Santa Ana’s <br />Public Works Department completed their review of Urban Crossroads’ Focused Traffic <br />Assessment and concurred with Urban Crossroads’ findings and determinations. <br /> <br /> <br />4-42