My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A - 01-28-19_MINUTES
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
02-11-19
>
A - 01-28-19_MINUTES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:21:35 PM
Creation date
8/16/2019 4:21:30 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />5 <br />PLANNING COMMISSION MINUTES January 28, 2019 <br /> <br />MOTION: <br /> <br />1. Adopt a resolution approving Conditional Use Permit No. 2018-26 as conditioned <br />to allow drive-through window service; and <br />2. Adopt a resolution approving Variance No. 2018-12 as conditioned to allow for: <br />a. A reduction in required landscape setbacks; and <br />b. Utilization of two existing driveways within 150 feet of a street intersection. <br /> <br />MOTION: Nguyen SECOND: Verino <br />VOTE: AYES: Cano, Contreras-Leo, McLoughlin, Nguyen, Verino (5) <br /> NOES: None (0) <br /> ABSTAIN: None (0) <br /> ABSENT: Alderete, Benavides (2) <br /> <br /> <br />4. CONDITIONAL USE PERMIT NO. 2019-01 TO ALLOW FOR THE CONSTRUCTION OF A <br />NEW TWO-STORY, 9,928-SQUARE FOOT COMMUNITY SERVICE BUILDING AND <br />ADDITIONAL SEATS WITHIN THE EXISTING CHURCH FOR ARCHANGEL MICHAEL <br />COPTIC ORTHODOX CHURCH LOCATED AT 4405 WEST EDINGER AVENUE, AND <br />MINOR EXCEPTION NO. 2019-01 TO ALLOW THE TWO-STORY COMMUNITY SERVICE <br />BUILDING TO EXCEED THE MAXIMUM BUILDING HEIGHT OF 27 FEET BY 5 FEET, 5 <br />INCHES, FOR A TOTAL HEIGHT OF 32 FEET 5 INCHES. THE PROJECT ALSO <br />INCLUDES DEMOLITION OF FIVE EXISTING SINGLE-FAMILY HOMES AND <br />CONSOLIDATION OF THE LOTS INTO ONE PARCEL – MARIAM SOLIMAN APPLICANT <br /> <br />Pursuant to the California Environment Quality Act (CEQA) the project is exempt per <br />Section 15332 of the CEQA Guidelines - Class 32 In-Fill Development Projects. <br /> <br />Legal noticed published in the Orange County Reporter on January 18, 2019 and notices <br />mailed on January 18, 2019. <br /> <br />Case Planner Selena Kelaher provided a presentation which included a description of the <br />project, project background and project analysis. Commission discussion ensued regarding <br />site access, conditions of approval, parking, and neighborhood concerns. <br /> <br />The applicant spoke in support of the matter. Reported that the current facility is in poor <br />condition and the proposed project will greatly be nefit the congregation. Also reported that <br />Church has been working with neighborhood to address concerns regarding parking. <br /> <br />Written communication in support of the matter was received by the following individuals: <br /> <br /> Martha Tadross <br /> Atef Tadross <br /> Joseph Qest & Mina Milad <br /> Frank Hernandez <br /> Mary Tadros <br /> Gabriela V. Mattar <br /> Sabri Rizkalla <br /> Isis Tadros <br /> Shery Assal <br /> Raphaela Sefine <br />A-5
The URL can be used to link to this page
Your browser does not support the video tag.