Laserfiche WebLink
  <br />  <br /> <br /> <br /> <br />DRAFT <br /> <br />MEMORANDUM <br /> <br /> <br />TO: Zdenek Kekula, P.E. <br />City of Santa Ana <br /> <br />FROM: Patrick A. Gibson, P.E., T.E., PTOE, and Casey Le, EIT <br /> <br />DATE: June 26, 2018 <br /> <br />RE: Traffic Study for the <br />Rocket Express Car Wash <br /> Santa Ana, California Ref: J1461 <br /> <br /> <br /> <br />The approved Traffic Study for the Rocket Express Car Wash, Santa Ana, California <br />(Gibson Transportation Consulting, Inc., June 2016) (Approved Traffic Study) has been <br />revised to analyze an updated site access and circulation scheme for the Car Wash <br />(Project). The updated site plan proposes one full-access driveway along 17th Street, located <br />along the southern boundary of the Project site. No driveway is proposed along Mabury <br />Street, along the western boundary of the Project site, and, thus, the Project would eliminate <br />any traffic queue-related issues along Mabury Street. <br /> <br />It should be noted that the revisions do not result in changes to the analyses assumptions, <br />methodologies, and conclusions presented in the Approved Traffic Study. The conclusions <br />presented in Approved Traffic Study are the same and remain valid. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1-58