Laserfiche WebLink
PROJECT TITLE: <br />Residential Street Repair Program <br />PROJECT CATEGORY: <br />Street Improvements - <br /> Neighborhood Street Resurfacing <br />PROJECT NEED: <br />The local street network has 316 miles citywide. In <br />2007 the City embarked on an extensive citywide <br />improvement plan to rehabilitate and slurry seal the <br />majority of the network. By the end of 2015, the City <br />has completed rehabilitating all asphalt residential <br />streets and currently working toward improving all <br />residential concrete streets. <br />PROJECT DESCRIPTION: <br />This project entails the rehabilitation of existing <br />roadway pavement for local streets. The project will <br />include the removal and replacement of existing <br />concrete streets. Various replacement pavement <br />strategies will be investigated to determine the most <br />cost effective and maintainable treatment. Minor <br />concrete repair to severely damaged or missing curbs, <br />gutters, sidewalks, and wheelchair ramps will also be <br />included. Work in FY 19/20 will focus on the Heninger <br />Neighborhood. <br />SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />CDBG Programs $921,227 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 <br />TOTAL $921,227 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 <br />PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />Construction $852,977 $925,000 $925,000 $925,000 $925,000 $925,000 $925,000 <br />Engineering $68,250 $75,000 $75,000 $75,000 $75,000 $75,000 $75,000 <br />TOTAL $921,227 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 <br />LOCATION MAP <br />CONTACT:DATE: <br />12-Apr-2019 <br />AGENCY <br />Public Works Agency <br />DIVISION: <br />Design Engineering Jason Gabriel, Principal Civil Engineer <br />- 6 - <br />CITY OF SANTA ANA FY 19/20 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />1-29