My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1 - CIP 2018-2019
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
04-22-19
>
1 - CIP 2018-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:38:05 PM
Creation date
8/16/2019 4:37:16 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Bristol Street Improvements and Widening: <br />Phase 3B - Washington to 17th <br />PROJECT CATEGORY: <br />Street Improvements - <br /> Street/Bridge Improvements & Widening <br />PROJECT NEED: <br />Bristol Street from Washington Avenue to 17th Street <br />(Phase 3B) is part of the City's plan to widen <br />Bristol Street from Warner Avenue to Memory Lane, <br />which was approved by City Council in 1990 and <br />reevaluated in 2015. Existing roadway has only 2 lanes <br />in each direction and is operating at a LOS F. This <br />widening is needed to improve traffic flow and create <br />complete streets features. <br />PROJECT DESCRIPTION: <br />The Bristol Street Improvements project was planned <br />and designed to incorporate complete street concepts <br />with storm drain quality features. The improvements <br />include widening of the street from four lanes to six <br />lanes, with bus turnouts, raised median, protected bike <br />lanes, and sound walls. The project also brings native <br />and organic landscaping that beautifies a fully <br />developed urban area. <br />SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />GAS TAX (PY)$600,000 <br />TSIA AREA F (PY)$572,000 <br />TOTAL $1,172,000 <br />PY = Funds awarded in Multiple Prior Fiscal Years <br />PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />Construction $572,000 <br />Right-Of-Way $600,000 <br />TOTAL $1,172,000 <br />LOCATION MAP <br />CONTACT:DATE: <br />12-Apr-2019 <br />AGENCY <br />Public Works Agency <br />DIVISION: <br />Design Engineering Sean Thomas, Senior Civil Engineer <br />- 14 - <br />CITY OF SANTA ANA FY 19/20 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />1-37
The URL can be used to link to this page
Your browser does not support the video tag.