My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1 - CIP 2018-2019
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
04-22-19
>
1 - CIP 2018-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:38:05 PM
Creation date
8/16/2019 4:37:16 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Traffic Signal Equipment Replacement <br />PROJECT CATEGORY: <br />Traffic Improvements - <br /> Traffic Improvements <br />PROJECT NEED: <br />Much of the traffic signal, pedestrian and monitoring <br />equipment in the City is old and no longer supported by <br />the manufacturers. This equipment needs to be <br />upgraded to maintain operations and to meet current <br />standards. <br />PROJECT DESCRIPTION: <br />Replace outdated traffic signal and monitoring <br />equipment, such as cabinets, conflict monitors, <br />controllers, CCTV, and communication equipment, both <br />in the field and in the traffic management center. <br />SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />M2 LOCAL <br />FAIRSHARE <br />$100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 <br />TOTAL $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 <br />PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />Construction $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 <br />TOTAL $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 $100,000 <br />LOCATION MAP <br />CITYWIDE <br />CONTACT:DATE: <br />12-Apr-2019 <br />AGENCY <br />Public Works Agency <br />DIVISION: <br />Transportation & Traffic Engineering Cesar Rodriguez, Senior Civil Engineer <br />- 21 - <br />CITY OF SANTA ANA FY 19/20 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />1-44
The URL can be used to link to this page
Your browser does not support the video tag.