My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1 - CIP 2018-2019
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
04-22-19
>
1 - CIP 2018-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:38:05 PM
Creation date
8/16/2019 4:37:16 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Davis Elementary SRTS <br />PROJECT CATEGORY: <br />Traffic Improvements - <br /> Traffic Safety / Mobility <br />PROJECT NEED: <br />Project is designed to increase pedestrian safety and <br />mobility. <br />PROJECT DESCRIPTION: <br />Installation of bulb-outs at crossings adjacent to Davis <br />Elementary, reconstruction and installation of ADA <br />compliant curb ramps, sections of sidewalk and <br />driveways along the safe routes to school (SRTS). <br />SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />ATP $4,834,000 <br />TOTAL $4,834,000 <br />PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />Construction $4,834,000 <br />TOTAL $4,834,000 <br />LOCATION MAP <br />CONTACT:DATE: <br />12-Apr-2019 <br />AGENCY <br />Public Works Agency <br />DIVISION: <br />Design Engineering Kenny Nguyen, Senior Civil Engineer <br />- 23 - <br />CITY OF SANTA ANA FY 19/20 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />1-46
The URL can be used to link to this page
Your browser does not support the video tag.