My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1 - CIP 2018-2019
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
04-22-19
>
1 - CIP 2018-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:38:05 PM
Creation date
8/16/2019 4:37:16 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Citywide Sewer Main Improvements Phase 2 <br />PROJECT CATEGORY: <br />Utility/Drainage/Lighting Improvements - <br /> Sewer Improvements <br />PROJECT NEED: <br />This project is required to maintain effective operation <br />of the City's sanitary sewer system. These <br />improvements will eliminate the undersized sewer <br />mains, reduce sewer maintenance, and prevent sewer <br />spills. <br />PROJECT DESCRIPTION: <br />This project will replace existing deteriorated and over <br />capacity sewer mains, and related sewer assets, such <br />as manholes and laterals. <br />SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />SEWER $1,560,000 <br />TOTAL $1,560,000 <br />PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />Construction $1,560,000 <br />TOTAL $1,560,000 <br />LOCATION MAP <br />CONTACT:DATE: <br />12-Apr-2019 <br />AGENCY <br />Public Works Agency <br />DIVISION: <br />Water Resources Armando Fernandez, Senior Civil Engineer <br />- 30 - <br />CITY OF SANTA ANA FY 19/20 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />1-53
The URL can be used to link to this page
Your browser does not support the video tag.