My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1 - CIP 2018-2019
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
04-22-19
>
1 - CIP 2018-2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:38:05 PM
Creation date
8/16/2019 4:37:16 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />Civic Center Perimeter Lighting Design <br />PROJECT CATEGORY: <br />City Facility Improvements - <br /> Park Facility Improvements <br />PROJECT NEED: <br />The Civic Center perimeter globe lighting is <br />approximately 50 years old. The lighting fixtures are <br />obsolete and parts are not available. A new street and <br />pedestrian LED lighting system needs to be designed <br />and implemented the following year. The LED lighting <br />is energy efficient with a white light that will improve <br />visibility and safety in the Civic Center. <br />PROJECT DESCRIPTION: <br />Electrical design of the street and pedestrian lighting <br />along the perimeter of the Civic Center Super block <br />(Civic Center Drive, Broadway, Santa Ana Blvd to <br />Flower Street). <br />SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />CIVIC CTR - CAPITAL <br />PROJ <br />$186,000 <br />TOTAL $186,000 <br />PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />Engineering $186,000 <br />TOTAL $186,000 <br />LOCATION MAP <br />CONTACT:DATE: <br />12-Apr-2019 <br />AGENCY <br />Parks, Rec. & Community Services <br />DIVISION: <br />Administrative Services Ron Ono, Administrative Services Manager <br />- 66 - <br />CITY OF SANTA ANA FY 19/20 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />1-89
The URL can be used to link to this page
Your browser does not support the video tag.