Laserfiche WebLink
PROJECT TITLE: <br />Civic Center Plaza of the Flag/Fountain <br />Structural Analysis <br />PROJECT CATEGORY: <br />City Facility Improvements - <br /> Park Facility Improvements <br />PROJECT NEED: <br />Through the years, water has penetrated through the <br />decorative and structural concrete slab of the Plaza of <br />the Flags/Fountain. Re-bars in the decorative and <br />structural slab are showing rust and corrosion. A <br />structural analysis report is needed to ensure the deck <br />is safe for public use and to provide information for <br />future repairs. <br />PROJECT DESCRIPTION: <br />Prepare a Structural Analysis Report of the Civic <br />Center Plaza of the Flags Deck and the Plaza of the <br />Fountains Deck to analyze the condition of the re-bars <br />and stability of the deck. <br />SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />CIVIC CTR - CAPITAL <br />PROJ <br />$90,000 <br />TOTAL $90,000 <br />PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />Construction $80,360 <br />Engineering $9,640 <br />TOTAL $90,000 <br />LOCATION MAP <br />CONTACT:DATE: <br />12-Apr-2019 <br />AGENCY <br />Parks, Rec. & Community Services <br />DIVISION: <br />Administrative Services Ron Ono, Administrative Services Manager <br />- 68 - <br />CITY OF SANTA ANA FY 19/20 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />1-91