My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
05-13-19
>
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:50:43 PM
Creation date
8/16/2019 4:46:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
598
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br /> proposed developments are not inconsistent with the proposed land use <br /> designations. The cumulative projects could result in cumulative <br /> impacts to adjacent land uses, especially residential areas. The <br /> cumulative impacts to local residents could consist of increased noise, <br /> reduced air quality, increased local traffic, increased illumination, <br /> etc., as described in the appropriate sections of this report. The <br /> proposed project would contribute to these cumulative impacts. <br /> 5.1.3 Mitigation Measures <br /> a) The project should be landscaped similar to, or more <br /> extensive than, the existing landscaping in order to buffer the <br /> development from surrounding residential areas as much as possible. <br /> b) All tenants displaced by the project will be provided <br /> assistance in accordance with State law and Santa Ana Redevelopment <br /> Agency policies. <br /> cj The Agency and the Project Participants should offer KLST <br /> land (including the Agency owned land to the south of the Fidelity <br /> Savings Building and a portion of the Project site in the near vicinity) <br /> at fair market value (or fair rent, if a lease arrangement is preferred) <br /> in trade-off against the acquisition of Sales Parcels 3 and 5. The land <br /> area so offered should be sufficient to allow a total of at least 351 <br /> parking spaces serving the Fidelity Savings Building assuming a maximum <br /> permitted amount of small car spaces, with the Agency and/or Project <br />.3, Participants bearing any necessary design and installation costs. <br /> d) Ultimate development of the project site should occur <br /> through the specific plan process. The specific plan should provide <br /> information on how the project would incorporate pedestrian walkways, <br /> building configurations, and open space with key transit routes. <br /> 56
The URL can be used to link to this page
Your browser does not support the video tag.