My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
05-13-19
>
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:50:43 PM
Creation date
8/16/2019 4:46:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
598
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 8 <br /> PHASE TWO <br /> TRANSPORTATION SYSTEM IMPROVEMENT PROGRAM <br /> Project Cost Priority <br /> Complete TSM/Parking Management $485,000 I <br /> Program. <br /> Auxiliary Lane S/B 1-5 7.0 M III <br /> Auxiliary Lane N/B I-S 8.0 M III <br /> Lawson Way Bridge 4.SM I <br /> Fashion Square Service Road Ramps 0.5 H I <br /> New S/B Main St. on-ramp 1.0 H I <br /> Realign N/B I-S/Main St. off-ramp 2.0 M II <br /> New La Veta Ave on-ramp 1.0 H II <br /> Modify 17th St./I-S Interchange 2.5 H II <br /> Modify Glassell St./Rte 22 <br /> Interchange 2.0 H III <br /> Widen Main St. (8 lanes Memory <br />U' Lane to La Veta) 2.OM I <br /> Complete Memory Lane (east <br />LA of Lawson Way) 75,000 II <br /> Complete Santa Ana Residential <br />LA Traffic Control Plan 50,000 I <br /> Develop Orange Residential <br /> Traffic Control Plan 50,000 I <br />Li <br /> Widen Bedford Road 500,000 III <br /> Total $31.66 Million <br /> 82
The URL can be used to link to this page
Your browser does not support the video tag.