My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
05-13-19
>
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:50:43 PM
Creation date
8/16/2019 4:46:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
598
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.13.2 Electricity <br /> 5.13.2.1 Environmental Setting <br /> Southern California Edison currently provides electricity to <br /> the project site. This site is served by four 12 kV circuits served <br />-! from four adjacent substations. Three of the circuits enter the site <br /> from overhead facilities and a fourth circuit enters the site as an <br />* - underground facility. Edison maintains an extensive underground system <br /> within the northerly portion (Fashion Square Shopping Center) of the <br /> project site.* <br />L 5.13.2.2 Impacts <br /> - Project Impacts <br />It <br /> The existing uses on the project site consume approximately <br /> 2,397,948 Kwh per month of electricity.** As indicated in Table 44, the <br />~1 <br /> proposed project would consume approximately 13,054,240 Kwh of <br />[A electricity per month. The removal of Mainstreet Center and the <br /> construction of the proposed project would result in a net increase in <br />K <br /> electrical consumption of approximately 10,656,292 Kwh per month. The <br /> proposed project would be served by existing facilities located in the <br />t area and the electric loads of the project are within parameters of <br /> projected load growth which Edison is planning to meet in this area <br />LI. (refer to Appendix IV).*** <br />[I <br />[.1 <br />LI _________________________ <br /> * B. K. Smith, Southern California Edison Company. <br /> ** Based on 3.5 Kwh a month per square foot. <br /> *** B. K. Smith, Southern California Edison Company. <br /> 1 7P
The URL can be used to link to this page
Your browser does not support the video tag.