My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
05-13-19
>
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:50:43 PM
Creation date
8/16/2019 4:46:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
598
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.13.7.3 Mitigation Measures <br /> The Participants should provide a private security force to <br /> respond to business and customer needs. The presence-of a security <br /> force would also have a deterrent effect on crime. <br /> U <br /> 5.13.7.4 Significant Environmental Effects <br /> 6 The project would result in an increased demand on police <br /> services. <br /> V 5.13.8 Fire <br /> C <br /> 5.13.8.1 Environmental Setting <br /> The project site is provided fire protection by the City of <br /> - Santa Ana. Table 52 lists the fire stations that presently serve the <br /> project. <br /> TABLE 52 <br /> I FIRE STATIONS SERVING THE SITE <br /> STATION LOCATION RESPONSE TIME <br /> 6 #1 1029 W. 17th Street* Approx. 3.4 mm. <br /> #10 2301 Old Grand Approx. 4.0 mm. <br /> #5 120 W. Walnut* Approx. 4.0 mm. <br /> #2 1688 E. 4th Street Approx. 5.0 mm. <br /> Ii- <br /> * Paramedic service. <br /> 194
The URL can be used to link to this page
Your browser does not support the video tag.