My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
05-13-19
>
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:50:43 PM
Creation date
8/16/2019 4:46:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
598
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
55394.00053\32005824.1 <br /> <br />EXHIBIT A <br /> <br />Conditions for Approval for Tentative Parcel Map No. 2018-01 <br /> <br />Tentative Parcel Map No. 2018-01 is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Manager, with applicable sections of the Santa Ana Municipal <br />Code, the California Administrative Code, the California Building Standards Code, and all <br />other applicable regulations. In addition, Applicant shall meet the following conditions of <br />approval: <br /> <br />The Applicant must comply with each and every condition listed below prior to exercising <br />the rights conferred by this tentative tract map. <br /> <br />The Applicant must remain in compliance with all conditions listed below throughout the <br />life of the development project. Failure to comply with each and every condition may result <br />in the revocation of the tentative tract map. <br /> <br />1. All proposed site improvements must conform to the Site Plan Review approval of DP <br />No. 2018-17. <br />2. The project and map shall comply at all times with the requirements listed in the <br />attached Public Works Agency memorandum dated May 8, 2019 and attached hereto. <br />3. Two copies of the recorded final parcel map shall be submitted each to the Planning <br />Division, Building Division and Public Works Agency within 10 days of recordation. <br />4. Applicant must submit Covenants, Conditions and Restrictions (CC&Rs) for the <br />project to the case planner for review and approval prior to the final map being <br />recorded <br />5. The tentative parcel map, final map and all improvements required to be made or <br />installed by the subdivider shall be in accordance with the requirements and design <br />standards and specifications of the City of Santa Ana and the requirements of the <br />State Subdivision Map Act. <br />6. After project occupancy, landscaping is to be maintained in accordance with the <br />landscape plan approved for the project. This shall include the minimum levels of <br />plant materials shown on the landscape plan and installed at the time of occupancy. <br />7. The property owner shall be responsible for maintaining the lots free from debris, <br />overgrown vegetation, and graffiti. The property owner shall provide as part of the <br />Covenants, Conditions and Restrictions (CC&Rs) that the owner of each <br />condominium shall immediately remove any graffiti placed thereon. Any graffiti must <br />be removed within 24 hours
The URL can be used to link to this page
Your browser does not support the video tag.