My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
05-13-19
>
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:50:43 PM
Creation date
8/16/2019 4:46:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
598
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sewer Feasibility Study, and Preliminary Water Quality Management Plan necessary to <br />support that phase of development being proposed. (Added to comment EE) <br /> <br />2. Submit and have approved Street Improvement Plans prepared by a registered civil <br />engineer for construction of bikelane along MainPlace Mall Drive including sandblasting <br />of existing striping, slurry seal of new pavement and striping of new lanes prior to <br />recordation of first phase of development being proposed. (Added to comment EE) <br /> <br />1. Construct sidewalk along Mainplace Drive necessary to support that phase of <br />development being proposed. The sidewalk shall connect to an existing City sidewalk <br />directly or through an accessible path of travel through private property with proper <br />pedestrian signage and easements. (New comment EE) <br /> <br />2. Complete street vacation process for portion of Main Place Drive to be abandoned in <br />advance of the recordation of parcels 1, 2, and/or 9. (Added to comment EE) <br /> <br />3. Complete construction of, or provide a bond for all public and private water and sewer <br />improvements necessary to support that phase of development being proposed. (Added to <br />comment EE) <br /> <br />4. Provide required easements, through a final map, separate instrument or equivalent <br />document for all public water and sewer improvements necessary to support that phase <br />of development being proposed. (Added to comment EE) <br /> <br />5. Provide required CC&R for maintenance and cost sharing responsibility for all private <br />water and sewer improvements necessary to support that phase of development being <br />proposed. (New comment EE) <br /> <br />6. Complete construction of, or provide a bond for all public improvements as shown on <br />the site plan, tentative map and all requirements hereon necessary to support that phase <br />of development being proposed. (Added to comment EE) <br /> <br />C. Prior to Submittal into Building plan check, complete the following: <br /> <br />Submit to the Public Works agency any of following as applicable to the project: <br />begin review process of surface drainage/grading/utility plans, erosion control plan, water <br />quality management plan, street improvement plan, copy of the Storm Water Pollution <br />Prevention Plan, State Water Board WDID number, street vacation, CC&Rs, easements and <br />parcel map as described below under “Section C. Prior to issuance of building permit”, by <br />making the initial submittal of the listed plans and maps, and paying the required fees. <br /> <br />D. Prior to issuance of a building permit, complete the following: <br />
The URL can be used to link to this page
Your browser does not support the video tag.