My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
05-13-19
>
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:50:43 PM
Creation date
8/16/2019 4:46:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
598
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. OCSD officials shall approve construction of a new or using an existing OCSD sewer <br />lateral connection in advance (if applicable). The developer shall submit design plans to <br />OCSD for review and approval. After approval of the design connection plans by OCSD, <br />the City of Santa Ana will process an OCSD connection permit. Upon payment of <br />applicable OCSD permit inspection fees, a connection permit will be issued to the <br />developer by OCSD <br /> <br />6. Any existing sewer lateral(s) serving the project site shall be capped and abandoned at the <br />main line per City of Santa Ana standards, (contact Mir Fattahi for the latest sewer <br />abandonment standard.) <br /> <br />Contact Water Division, at (714) 647-3320, for assistance. <br /> <br />D. Prior to release of utilities or a certificate of occupancy, complete the following: <br /> <br />1. Complete construction of all the required improvement in the public right-of-way <br />necessary to support that phase of development being proposed and provide a copy of the <br />signed off street work permit. (Added to comment EE) <br /> <br />Please contact Ehab Elias, at (714) 647-5627, for assistance regarding the above requirements. <br /> <br />T:\Development Services\Development Projects\MainN2800_2018- <br />017_MainPlaceMallRevitalizationMasterPlan_EE\MEMO_MainN2800_2018-017R_MainPlaceMallRevitalizationMasterPlan_EE.doc
The URL can be used to link to this page
Your browser does not support the video tag.