My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-28-19_AGENDA PACKET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
05-28-19
>
05-28-19_AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:54:56 PM
Creation date
8/16/2019 4:53:24 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Guidelines for Implementing the <br />California Environmental Quality Act (2019) TYPES OF EIRS <br /> <br /> <br />2019 City of Santa Ana Local Guidelines 8-7 ©Best Best & Krieger LLP <br />the Lead Agency makes this finding, it must provide public notice of the availability of its proposed <br />finding for public review and comment in the same manner as if it were providing public notice of <br />the availability of a draft EIR. (See Sections 15177(d) and 15087 of the State CEQA Guidelines <br />and Section 7.25 of these Local Guidelines.) <br />A previously certified Master EIR cannot be relied upon to limit review of a subsequent <br />project if: <br />(a) A project not identified in the certified Master EIR has been approved and that project may <br />affect the adequacy of the Master EIR for the subsequent project now under consideration; <br />or <br />(b) The Master EIR was certified more than five (5) years before the filing of an application <br />for the subsequent project, unless the City reviews the adequacy of the Master EIR and: <br />(1) Finds that, since the Master EIR was certified, no substantial changes have <br />occurred that would cause the subsequent project to have significant <br />environmental impacts, and there is no new information that the <br />subsequent project would have significant environmental impacts; or <br />(2) Prepares an Initial Study and either certifies a Subsequent or Supplemental <br />EIR or adopts a Mitigated Negative Declaration that addresses any <br />substantial changes or new information that would cause the subsequent <br />project to have potentially significant environmental impacts. The <br />certified subsequent or supplemental EIR must either be incorporated into <br />the previously certified Master EIR or the City must identify any deletions, <br />additions or other modifications to the previously certified Master EIR in <br />the new document. The City may include a section in the subsequent or <br />supplemental EIR that identifies these changes to the previously certified <br />Master EIR. <br />When the Lead Agency cannot find that the subsequent project will have no additional <br />significant environmental effect and no new mitigation measures or alternatives will be required, <br />it must prepare either a Mitigated Negative Declaration or an EIR for the subsequent project. <br />8.12 FOCUSED EIR. <br />A Focused EIR is an EIR for a subsequent project identified in a Master EIR. It may be <br />used only if the City finds that the Master EIR’s analysis of cumulative, growth-inducing, and <br />irreversible significant environmental effects is adequate for the subsequent project. The Focused <br />EIR must incorporate by reference the Master EIR. <br />The Focused EIR must analyze additional significant environmental effects not addressed <br />in the Master EIR and any new mitigation measures or alternatives not included in the Master EIR. <br />“Additional significant effects on the environment” means those project-specific effects on the <br />environment that were not addressed as significant effects on the environment in the Master EIR. <br />The Focused EIR must also examine the following: <br />3 -138
The URL can be used to link to this page
Your browser does not support the video tag.