My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-10-19_AGENDA PACKET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
06-10-19
>
06-10-19_AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2019 9:54:24 AM
Creation date
8/16/2019 4:55:04 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />7-Eleven Convenience Store and Service Station Project <br />Mitigation Monitoring and Reporting Program <br />Table 1 (cont.): 7-Eleven Convenience Store and Service Station Project Mitigation Monitoring and Reporting Program <br />Mitigation Measures Method of Verification <br />used. Passive pressure can be computed using an allowable <br />lateral pressure of 300 psf per foot of depth below the <br />ground surface for level ground conditions. Reductions for <br />sloping ground shall be made. The passive pressure can be <br />increased by one-third when considering the total of all <br />loads, including wind or seismic forces. The upper 1 foot of <br />soil shall not be relied on for passive support unless the <br />ground is covered with pavements or slabs. <br />Foundation Plan Review: A Geotechnical Engineer shall <br />review the foundation plans to ascertain that the intent of <br />the recommendations in this report has been implemented <br />and that revised recommendations are not necessary as a <br />result of changes after this report was completed. <br />Foundation Excavation Observations: A representative <br />working under direct supervision of the Geotechnical <br />Engineer shall observe the foundation excavations prior to <br />forming or placing reinforcing steel. <br />MM GEO-3: Slabs -On -Grade <br />Review and approval of <br />• Interior Slabs on Grade: The top 24 inches of material below <br />construction plans and <br />interior concrete slabs -on -grade shall have an expansion <br />conduct on -site <br />index of 20 or less. The project structural engineer shall <br />inspections <br />design the interior concrete slabs -on -grade floor. However, <br />we recommend a minimum thickness of 5 inches. <br />- A vapor barrier shall be placed beneath slabs where <br />moisture sensitive floor coverings will be installed. If plastic <br />is used, a minimum 10-mil is recommended. The plastic <br />shall comply with ASTM E1745. Installation shall comply <br />with ASTM E1643. Current construction practice typically <br />includes placement of a 2-inch thick sand cushion between <br />the bottom of the concrete slab and the moisture vapor <br />retarder/barrier. This cushion can provide some protection <br />FirstCarbon Solutions <br />Y:\Publications\Client(PN-1N)\0327\03270041\MMRP\03270041 City of Santa Ana 7-Eleven MMRP.docx <br />Verification of Completion <br />Responsible for <br />Timing of Verification Verification Date Initial <br />Prior to and during City of Santa Ana <br />construction <br />1-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.