My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-10-19_AGENDA PACKET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
06-10-19
>
06-10-19_AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2019 9:54:24 AM
Creation date
8/16/2019 4:55:04 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />7-Eleven Convenience Store and Service Station Project <br />Mitigation Monitoring and Reporting Program <br />Table 1 (cont.): 7-Eleven Convenience Store and Service Station Project Mitigation Monitoring and Reporting Program <br />Mitigation Measures <br />• The construction contractor shall utilize "quiet" models of air <br />compressors and other stationary noise sources where <br />technology exists. <br />• At all times during project grading and construction, the <br />construction contractor shall ensure that stationary noise - <br />generating equipment shall be located as far as practicable <br />from sensitive receptors and placed so that emitted noise is <br />directed away from the nearest residential land uses. <br />• The construction contractor shall designate a noise <br />disturbance coordinator who would be responsible for <br />responding to any local complaints about construction noise. <br />The disturbance coordinator would determine the cause of <br />the noise complaints (starting too early, bad muffler, etc.) <br />and establishment reasonable measures necessary to <br />correct the problem. The construction contractor shall visibly <br />post a telephone number for the disturbance coordinator at <br />the construction site. <br />• The construction contractor shall limit construction activities <br />to the hours between 7:00 a.m. and 8:00 p.m. Monday <br />through Saturday. Construction activities are prohibited on <br />Sundays and federal holidays. <br />17. Transportation <br />Method of Verification <br />MM TRANS-1: Ensure adequate sight distance is provided at Review and approval of <br />each project access location per the City of Santa Ana. Sight site plans and conduct on - <br />distance at all project access points should be reviewed with site inspections <br />respect to City of Santa sight distance standards at the time of <br />preparation of final grading, landscape, and street <br />improvement plans. <br />FirstCarbon Solutions <br />Y:\Publications\Client(PN-1N)\0327\03270041\MMRP\03270041 City of Santa Ana 7-Eleven MMRP.docx <br />Responsible for <br />Timing of Verification Verification <br />Prior to grading City of Santa Ana <br />permits and prior to <br />certificate of <br />occupancy <br />Verification of Completion <br />Date Initial <br />14 <br />1-28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.