My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-10-19_AGENDA PACKET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
06-10-19
>
06-10-19_AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2019 9:54:24 AM
Creation date
8/16/2019 4:55:04 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WEST 1ST STREET <br />Lnl V LJ V \Jnl L. 1 Lnl V <br />W E 10' 0 10, 20' 30' <br />—7r ==EIIIIIIII1 <br />S GRAPHIC SCALE: 1" = 10' <br />PLANTING LEGEND <br />Symbol Botanical Name/Common Name <br />Quantity Size WUCOLS Remarks <br />TREES <br />• Tristania conferta / Brisbane Box 5 36" Box M <br />G <br />SHRUBS <br />Dodonaea viscosa 'Purpurea' / <br />35 <br />5g <br />L <br />® <br />Purple hopseed bush @ 36 o.c. <br />Leptospermum scoparium / New Zealand <br />3 <br />15g <br />M <br />Tea Tree @ 36" o.c. <br />OLeymus <br />condensatus 'Canyon Prince' / <br />204 <br />1 g <br />L <br />O <br />Canyon rye grass @ 30" o.c. <br />Phlomis fruticosa / Jerusalem Sage <br />77 <br />5g <br />L <br />@ 36 o.c. <br />VINES <br />N <br />Trachelospermum jasminoides / Star jasmine <br />12 <br />15g <br />M <br />GROUND COVER <br />Nandina domestica 'Nana Purpurea' / <br />66 <br />1 g <br />M <br />Dwarf heavenly bamboo <br />262 sf @ 24" o.c. <br />GENERAL PLANTING NOTES <br />1. THE CONTRACTOR SHALL MAINTAIN A QUALIFIED SUPERVISOR ON THE SITE AT ALL TIMES DURING <br />CONSTRUCTION THROUGH COMPLETION OF PICK-UP WORK. <br />2. THE CONTRACTOR SHALL VERIFY ALL PLANT MATERIAL QUANTITIES PRIOR TO INSTALLATION. PLANT <br />MATERIAL QUANTITIES LISTED FOR CONVENIENCE OF CONTRACTOR. ACTUAL NUMBER OF SYMBOLS SHALL <br />HAVE PRIORITY OVER QUANTITY DESIGNATED. <br />EV <br />ELEVEn <br />fiedlergroup <br />Design X Engineering <br />299 N. Euclid Ave., Ste 550 <br />Pasadena, CA 91 101 <br />(213) 381-7891 <br />fiedlergroup.com <br />88 Know what's below. <br />' 1 Call before you dig. <br />CALL AT LEAST TWO DAYS <br />BEFORE YOU DIG <br />www.call8ll.com <br />3. THE CONTRACTOR SHALL FURNISH AND PAY FOR ALL CONTAINER GROWN TREES, SHRUBS AND VINES, <br />INCLUDING SEEDED AND SODDED TURF, HYDROMULCHES AND FLATTED GROUNDCOVERS. THE CONTRACTOR <br />SHALL ALSO BE RESPONSIBLE AND PAY FOR: PLANTING OF ALL PLANT MATERIALS; THE SPECIFIED <br />GUARANTEE OF ALL PLANT MATERIALS; THE STAKING AND GUYING OF TREES AND THE CONTINUOUS <br />W PROTECTION OF ALL PLANT MATERIALS UPON THEIR ARRIVAL AT THE SITE. <br />NO. <br />DATE <br />REVISION DESCRIPTION <br />D 4. ALL PLANT MATERIAL SHALL BE SUBJECT TO APPROVAL BY THE LANDSCAPE ARCHITECT AND OWNER PRIOR <br />Z TO INSTALLATION. <br />W 5. ALL BOXED TREES IN PAVING SHALL BE SELECTED AND SPOTTED BY THE LANDSCAPE ARCHITECT OR <br />> OWNER'S REPRESENTATIVE IN CONJUNCTION WITH PAVING CONTRACTOR AND GENERAL CONTRACTOR. <br />GENERAL CONTRACTOR TO ASSUME ALL LIABILITY FOR ACCURATE PLACEMENT OF TREES. <br />` 6. ALL VINE RUNNERS SHALL BE INSTALLED WITH THE NURSERY STAKES REMOVED AND VINE RUNNERS SHALL <br />r BE ESPALIERED TO THE ADJACENT WALL OR FENCE. <br />7. ALL SOIL PREPARATION SHALL BE INSTALLED AS PER THE SOIL AGRONOMY REPORT TO BE PROVIDED AND <br />PAID FOR BY THE SUBCONTRACTOR. THE REPORT SHALL BE IMMEDIATELY FORWARDED TO THE LANDSCAPE <br />Q ARCHITECT UPON COMPLETION. <br />8. THE SOIL AMENDMENTS SPECIFIED ARE FOR BIDDING PURPOSES ONLY. THE CONTRACTOR SHALL PROVIDE <br />FOR A SOILS AGRONOMY REPORT FROM WALLACE SOILS LABORATORY (310) 615-0116 AND/OR ANY <br />ADDITIONAL SPECIFICATION PROVIDED BY THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION OF PLANT <br />�pNDSCAPF q <br />�Paul A. Lewis y� <br />No.3620 <br />J —' <br />MATERIALS. <br />O 9. FOR BIDDING AREA TO BE LANDSCAPED, THE FOLLOWING AMENDMENTS SHALL BE USED UNTIL <br />CONTRACTOR IS PROVIDED WITH SOILS AGRONOMY REPORT. AMENDMENTS SHALL BE UNIFORMLY <br />BROADCAST AND THOROUGHLY INCORPORATED BY MEANS OF A ROTOTILLER OR EQUAL. <br />AMOUNT PER 1,000 SQUARE FEET <br />4 CU. YDS. NITROGEN STABILIZED ORGANIC AMENDMENT DERIVED FROM REDWOOD SAWDUST, <br />FIR SAWDUST OR CEDAR SAWDUST. <br />15 LBS. SOIL SULFUR <br />15 LBS. 12-12-12 FERTILIZER <br />10. INSTALL 2" (TWO INCHES) SHREDDED BARK MULCH OVER ALL SHRUB AREAS. - CONTRACTOR TO SUBMIT <br />1/2 CU. FT BAG AS SAMPLE FOR APPROVAL PRIOR TO INSTALLATION. <br />11. THE PLANTING PITS FOR BOXED TREES SHALL BE EXCAVATED TWICE THE DIAMETER OF THE ROOTBALL <br />WITH A MAXIMUM OF THE HEIGHT OF THE ROOTBALL TO THE BOTTOM OF THE PLANTING PIT. <br />DO NOT OVER EXCAVATE!!! <br />THE BACKFILL MIX FOR USE AROUND THE ROOTBALL OF ALL TREES AND SHRUBS SHALL CONSIST OF THE <br />FOLLOWING FORMULA: <br />6 PARTS ON -SITE SOIL <br />4 PARTS BY VOLUME ORGANIC AMENDMENT PER ABOVE SOIL PREPARATION <br />1 LB./CU.YD. OF MIX 12-12-12 COMMERCIAL FERTILIZER <br />2 LBS./CU. YD. OF MIX IRON SULFATE <br />10 LBS./CU. YD. OF MIX AGRICULTURAL GYPSUM <br />12. THIRTY (30) DAYS AFTER INSTALLATION ALL LANDSCAPE SHALL BE FERTILIZED WITH BEST FERTILIZER <br />COMPANY 16-6-8 OR APPROVED EQUAL, APPLIED AT THE RATE OF SIX POUNDS (6 LBS.) PER 1,000 SQUARE <br />FEET OR PER SOIL AGRONOMY REPORT. FERTILIZER APPLICATION SHALL BE CONTINUED THEREAFTER AT <br />MONTHLY INTERVALS. <br />13. FOR ALL STAKED TREES, SEE DETAIL 1, SHEET L1.1. <br />14. FOR ALL SHRUBS, SEE DETAIL 2, SHEET L1.1. <br />15. FERTILIZER TABLETS SHALL BE AGRIFORM, 21 GRAM TABLETS (20-10-5) IN QUANTITIES AS FOLLOWS: <br />1 GALLON SHRUBS <br />5 GALLON SHRUBS <br />15 GALLON SHRUBS <br />BOXED TREES <br />1 <br />3 <br />5 <br />1 PER 4" OF BOX SIZE <br />PLACE TABLETS AT HALF THE DEPTH OF THE ROOTBALL. <br />16. ALL EXISTING LANDSCAPE AREAS DISTURBED DURING THE CONSTRUCTION PROCESS WILL BE <br />RECONDITIONED TO THEIR ORIGINAL STATE AT NO ADDITIONAL COST TO THE OWNER. <br />17. INSTALL 24" DEEP ROOT BARRIER ON ALL TREES WITHIN 4 FEET OF PAVING. <br />GREEN BUILDING COMPLIANCE <br />I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE WATER EFFICIENT LANDSCAPE <br />ORDINANCE AND SUBMIT A COMPLETE LANDSCAPE DOCUMENTATION PACKAGE. <br />PAUL LEWIS, LANDSCAPE ARCHITECT DATE <br />L A N D S C A P E <br />ARCH ITEC TURE <br />COURTLAND STUDIO, LLC <br />505 E Colorado Blvd. Mezz C <br />Pasadena CA 91101 <br />P: 818-788-9382 <br />F: 818-788-3217 <br />Licensed Landscape Architect #3620 <br />Renewal Date 2/28/19 <br />date <br />-21 <br />sTgTF °FP CA���\P <br />CONFIDENTIALITY STATEMENT: <br />THIS DOCUMENT AND THE INFORMATION HEREIN RELATING <br />TO FIEDLER GROUP AND ITS CLIENT HAS BEEN FURNISHED IN <br />CONFIDENCE FOR THE PRIVATE USE OF AUTHORIZED <br />PERSONNEL. NO PART HEREOF SHALL BE COPIED, <br />DUPLICATED, DISTRIBUTED, DISCLOSED OR MADE AVAILABLE <br />TO OTHERS OR USED TO ANY EXTENT EXCEPT AS <br />EXPRESSLY AUTHORIZED IN WRITING BY FIEDLER GROUP. <br />ANY PERSON, FIRM OR CORPORATION RECEIVING THIS <br />DOCUMENT, SHALL BE HELD TO THE FOREGOING <br />RESTRICTIONS. <br />DEVELOPMENT INFORMATION: <br />7-ELEVEN <br />NEW C-STORE & <br />NEW 2 M.P.D. CANOPY <br />1904 W. 1 ST STREET <br />@ S. DAISY AVENUE <br />SANTA ANA, CA 92703 <br />#1040693/38278 <br />DESIGNED BY: <br />FG PM: <br />MB <br />CHECKED BY: <br />MEP PM: <br />PL <br />DRAWN BY: <br />CONSULTANT PM: <br />MC/AS <br />DATE: <br />PROJECT NO.: <br />05/21 /2019 <br />16062 <br />DRAWING TITLE: <br />LANDSCAPE PLAN <br />SHEET NO.: <br />Ll m0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.