City of Santa Ana 7-Eleven Convenience Store and Service Station Project Mitigation Monitoring and Reporting Program FirstCarbon Solutions 2 Y:\Publications\Client (PN-JN)\0327\03270041\MMRP\03270041 City of Santa Ana 7-Eleven MMRP.docx Table 1 (cont.): 7-Eleven Convenience Store and Service Station Project Mitigation Monitoring and Reporting Program Mitigation Measures Method of Verification Timing of Verification Responsible for Verification Verification of Completion Date Initial construction area. Placement and height will be determined by a qualified wildlife biologist, but the height of the bat house will be at least 15 feet. Bat houses will be multi-chambered and will be purchased or constructed in accordance with CDFW standards. The number of bat houses required will be dependent upon the size and number of colonies found, but at least one bat house will be installed for each pair of bats (if occurring individually), or of sufficient number to accommodate each colony of bats to be relocated. MM BIO-1b: If construction activity associated with development of the property is to occur during nesting bird season (February 1 through August 31), a qualified biologist shall conduct a pre-construction survey for nesting birds to identify any potential nesting activity. The pre-construction surveys for nesting birds shall be conducted within 14 days prior to any construction-related activities (grading, ground clearing, etc.). If nesting birds are identified on-site, a buffer (e.g., 250 feet for raptors, 100 feet for native songbirds) shall be maintained around the nests; no construction-related activities shall be permitted within the buffer. A qualified biologist shall monitor the nests, and construction activities may commence within the buffer area at the discretion and in the presence of the biological monitor. This mitigation measure is not required if construction activities occur outside of the nesting bird season (September 1 through January 31). Confirm pre-construction surveys for nesting birds were conducted. Prior to construction activities. City of Santa Ana 1-16