My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1 - EIR17-40; AA19-02; CUP19-12; CAR19-01_1904 W FIRST STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
06-10-19
>
1 - EIR17-40; AA19-02; CUP19-12; CAR19-01_1904 W FIRST STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:56:55 PM
Creation date
8/16/2019 4:56:02 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana 7-Eleven Convenience Store and Service Station Project Mitigation Monitoring and Reporting Program FirstCarbon Solutions 14 Y:\Publications\Client (PN-JN)\0327\03270041\MMRP\03270041 City of Santa Ana 7-Eleven MMRP.docx Table 1 (cont.): 7-Eleven Convenience Store and Service Station Project Mitigation Monitoring and Reporting Program Mitigation Measures Method of Verification Timing of Verification Responsible for Verification Verification of Completion Date Initial • The construction contractor shall utilize “quiet” models of aircompressors and other stationary noise sources wheretechnology exists.• At all times during project grading and construction, theconstruction contractor shall ensure that stationary noise-generating equipment shall be located as far as practicablefrom sensitive receptors and placed so that emitted noise isdirected away from the nearest residential land uses.• The construction contractor shall designate a noisedisturbance coordinator who would be responsible forresponding to any local complaints about construction noise.The disturbance coordinator would determine the cause ofthe noise complaints (starting too early, bad muffler, etc.)and establishment reasonable measures necessary tocorrect the problem. The construction contractor shall visiblypost a telephone number for the disturbance coordinator atthe construction site.•The construction contractor shall limit construction activitiesto the hours between 7:00 a.m. and 8:00 p.m. Mondaythrough Saturday. Construction activities are prohibited onSundays and federal holidays.17. TransportationMM TRANS-1: Ensure adequate sight distance is provided at each project access location per the City of Santa Ana. Sight distance at all project access points should be reviewed with respect to City of Santa sight distance standards at the time of preparation of final grading, landscape, and street improvement plans. Review and approval of site plans and conduct on-site inspections Prior to grading permits and prior to certificate of occupancy City of Santa Ana 1-28
The URL can be used to link to this page
Your browser does not support the video tag.