Laserfiche WebLink
City of Santa Ana <br />Page 2 <br />REBID: Project 17.6801 CIVIC CENTER BIKE BLVD & Project 17.6886 SEPULVEDA SAFE ROUTES TO SCHOOL <br />Printed 08107M019 <br />Bid Results <br />EXHIBIT A <br />Type <br />Item Code <br />UOM <br />Qty <br />Unit Prlca <br />Lina Total Comment <br />3 - <br />Cold Mllling" <br />SF <br />3200 <br />$2.00 <br />$6,400.00 <br />4 <br />Construct PCC Sidewalk (T=4")• <br />SF <br />37800 <br />$6.00 <br />$226,800.00 <br />5 <br />Construct PCC Driveway (T=8)• <br />SF <br />2600 <br />$9.00 <br />$23,400.00 <br />6 <br />Construct PCC Curb Ramp" <br />SF <br />17800 <br />$9.00 <br />$160,200.00 <br />7 <br />Construct PCC Curb and Gutter (Type A-2-6) <br />LF <br />4900 <br />$34.00 <br />$166,600.00 <br />8 <br />Construct PCC Curb only (B-1)' <br />- <br />LF <br />600 <br />$19.00 <br />$9,600.00 <br />9 <br />Construct PCC Cross Gutter (Local)' <br />SF <br />7000 <br />$12.00 <br />$84,000.00 <br />10 <br />Construct Bus Pad (Including Reber Dowels as -needed)' <br />SF <br />6600 <br />$23.00 <br />$128,800.00 <br />11 <br />Construct PCC Modified Curb (Traffic Circle)' <br />SF <br />880 <br />$23.00 <br />$20,240.00 <br />.12 <br />Construct Color Stamped Concrete Including rebar (T=10")• <br />SF <br />800 <br />$20.00 <br />$16.000.00 <br />13 <br />Root Shave <br />FA <br />6 <br />$400.00 <br />$2,400.00 <br />14 <br />Adjust Manhole Frame and Cover to Grade <br />FA <br />9 <br />$1,600.00 <br />$14,400.00 <br />15 <br />Adjust Water Valve Frame and Cover to Grade <br />FA <br />27 <br />$450.00 <br />$12,150.00 <br />16 <br />. . ............ . ._.. _ . ............ ...... . ..... <br />Fumish and Install New Fire Hydrant <br />... ..,... <br />EA <br />4 <br />$12.000.00 <br />$48.000.00 <br />17 <br />Abandon Water Valve <br />EA <br />4 <br />$3,500.00 <br />$14,000.00 <br />18 <br />Fumlah and Install New Water Meter Box and Cover to Grade <br />EA <br />8 <br />5500.00 <br />$2,500.00 <br />PlanetBlds, Inc. <br />23A-51 <br />