My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ SAFE ROUTE TO SCHOOL
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
09/03/2019
>
23A - PROJ SAFE ROUTE TO SCHOOL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2019 1:21:06 PM
Creation date
8/30/2019 1:17:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
9/3/2019
Destruction Year
2024
Document Relationships
G.J. GENTRY GENERAL ENGINEERING, INC. (2)
(Amended By)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />REBID: Project 17-68D7 CIVIC CENTER BIKE BLVD & Project 17-6886 SEPULVEDA SAFE ROUTES TO SCHOOL <br />Bid Results <br />Typo Item Code UOM Qty Unit Price <br />35 Type E Traffic Loop Detector <br />Page 4 <br />Printed 0810712019 <br />EXHIBIT A <br />Una Total Comment <br />EA <br />so <br />$270.00 <br />$13,500.00 <br />36 <br />Type D Traffic Loop Detector <br />EA <br />16 <br />$300.00 <br />$4,800.00 <br />37 <br />Fuslon Spllce I Strand SMFO <br />LS <br />. ... ....... <br />12 <br />$44.00 <br />$528.00 <br />38 <br />IP CommunleaUGn System at Civic Center Or and Main St <br />LS <br />1 <br />$7,800.00 <br />$7,800.00 <br />39 <br />Temporary Overhead Wiring at Civic Center Or and Maln St <br />LS <br />1 <br />$11.000.00 <br />$11.000.00 <br />40 <br />Signing and Sfilping (Project 17-6801) <br />LS <br />---------- . ... . . ...... . <br />1 <br />$160.000.00 <br />$160,000.00 <br />..... .. <br />41 Signing and Striping (Project 17-6886) <br />LS 1 $9,000.00 <br />42 Project Advertisement Slgn <br />EA <br />2 <br />$1,000.00 <br />$2,000.00 <br />. ... ......... .. <br />43 <br />Relocate Rectangular Rapid Flashing Beacons <br />EA <br />1 <br />$2,000.00 <br />$2,000.00 <br />44- <br />Remove Man Arm, Palo and Foundation <br />EA <br />1 <br />$6,000.00 <br />$6.000.00 <br />45 <br />Install Rectangular Rapid Flashing Beacons <br />EA <br />1 <br />$7,000.00 <br />$7.000.00 <br />46 <br />Labor Agreement Oversight <br />......... <br />LS <br />I <br />$10,000.D0 <br />$10,000.00 <br />47 <br />... . <br />Remove Interfacing AC Plpe and Replace Will PVC Pipe complete In Place <br />LF <br />60 <br />$200.00 <br />$12,000.00 <br />Subtotal <br />$2,850,418.00 <br />ADD ALTERNATIVE ONE <br />48 <br />Unclassified Excavation' <br />CY <br />110 <br />$160.00 <br />$16,600.00 <br />49 <br />AC Pavement' <br />TN <br />110 <br />$120.00 <br />$13.200.00 <br />Planelelds, Inc. <br />23A-53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.