Laserfiche WebLink
2) One TV One COR10master 4k multi -window 4RU video processor package <br />with Coriographer with video wall design software, The processing system <br />provides for 4 inputs and 12 outputs. <br />3) One TV One CORIOmaster C3-540 Chassis. +CM-4RPS Redundant P5U <br />4) Two TV One CORIOmaster CMHDBT21NIETHFF HDBT 2 input & <br />Ethernet. <br />5) Two TV One CORldmaster CMHDBTSC20UTI HDBase T2 scaled outputs <br />and 1 Ethernet. <br />6) Four TV One 22111093 HD —One DX TX HDBase T HDMI video and audio <br />extension Transmitter, Includes Tx &PSU. <br />7) Two TV One 2211094-02 HD -One DX RX — HDBaseT HDMI video and <br />audio Extension Receiver, Includes RX & PSU. <br />8) One TV One 1T-FC-766 HDMI to 3G-SDI Converter. <br />9) (Qty Two) TV One IT-CL-322-US 16x Control Panel Wall Plate, The <br />podium location will be in a cabinet (box)(the previse design to be determined <br />by City and VMI) to hide the _buttons_when_not being used. <br />10) Five TV One CM-DVI-ISC20UTFF Output Module with Stalling 2x DVI-I. <br />11) One TV One CM-4RPS-FF Redundant PSU for 4RU Series Units. <br />12) One TV One FE-1 On site CORIOmax Commissioning 2 days. <br />13) One link DGS-1100-24 Smart 24 port Gigabit Switch. <br />14) One M Atlantic ERK-2125LRD Rack with rear door, plus 9 outlets with <br />Surge protector. <br />15)One Custom 3 wide x 3 high wall attached Matrix Mount using RPV Fixed <br />Mount. to hold (9) Flat panel Displays (LG 55SVH7E 55ineh) Structure to <br />place the bottom of the linage 55" AFF and place the display array through an <br />existing rear projection opening. Final Height, position, depth, and space of <br />opening TBD at time of order by vendor/installer. Grid Matrix to provide <br />easy access to install and remove monitor panels during installation and future <br />monitor replacement. Upon completion of installation, Monitor Bezel space <br />must meet manufacturer (LG) spec of .88 mm B to B (Bezel to Bezel) **size, <br />verified by Nemko, With feeler gauge measurement. The Matrix Grid should <br />have documentation that it has earthquake resistance to meet or exceed State <br />of California Requirement for Zone 4. Ventilation Clearance required as per <br />manufacturer specifications. Black powder coat fmish, Reviewed & <br />Approved by City's Structural Engineer. (Will require pennit.) <br />16) Vendor must provide framing to hide the support grid. It must be conducive <br />with the decor of the council chambers and subject to review and approval by <br />the City's Principle Engineer <br />17) All other required cabling, (plenum when going through ceiling), connector, <br />adapters, hardware, equipment rack, labeling of equipment and cabling, and <br />any other items required for a "Turnkey Installation", <br />#2420v4 <br />