E.
<br />ON CALL PROJECTS
<br />142S S. Bon View Avenue,
<br />Don Meyer, 909 395-2677
<br />On Call Services since 2011, $1,200,000.00 per year
<br />1. Replacing old brick Manholes throughout the city, ongoing as needed
<br />2. Water Meter Replacements throughout city, ongoing, average of 300
<br />per month
<br />3. Long Side Services, 6th Street, $62,442.00, 10-27-17
<br />4. Flood Repairs, 6th Street, $6,478.00, 11-30.16
<br />5. Sewer Repair, Milliken, $17,183.00, 9.12-16
<br />E. Pacific Coast Highway, Newport Beach, CA 92660
<br />Brian Stith, 949 673-1331
<br />1. Repaired 6" water main at PCH and Bayslde. Received call at 6 pm, leak
<br />repaired and water flowing back by 11 pm, $4,117,00, 3-3.18
<br />RECENTLY COMPLETED
<br />PROJECTS
<br />Newport Beach, 100 Civic Center Drive, Newport Beach, CA
<br />92660
<br />Alfred Castanon 949 644-3314
<br />Balboa Island Water Main Replacement Phase 1
<br />4,000' 4-12" PVC pipeline and appurtenances with restoration
<br />$1,563,400.00 Project Awarded 12-1-17 Completed 4-18-18, 89% Own
<br />District, 33S92 West Street., Laguna Beach, CA
<br />L•}{fil
<br />Joe Sinacorl, 949 499.4555 ext. 3178
<br />PCH Recycled Water Distribution Bottleneck Upsizing Project
<br />Installed 6,350' 16" PVC pipeline and appurtenances with restoration
<br />$3,201,375.00 Project Awarded 7-26-16, Completed 5-27-17,84%Own
<br />forces
<br />City of Ontario, 2425 S. Bon View Avenue, Ontario, CA 91761
<br />Katie Glenger 909 395-2694
<br />Water Main Improvement, Phase 2 Project
<br />7,150' 8-12" DIP pipeline and appurtenances with restoration
<br />$2,338,077.00 Project Awarded 6-7-16, Completed 3-20-17 83%Own
<br />forces
<br />City of Newport Beach, 100 Civic Center Drive, Newport Beach, CA
<br />92660
<br />Patrick Arciniega 949 644-3347
<br />Corona del Mar Transmission Pipeline Improvement Project
<br />5,220' 30" CML/C, 2,600' 24" CMUC, 60' 18" CML/C, 490-16" CML/C
<br />pipeline and appurtenances, bored under PCH, Included restoration
<br />$4,402,750 Project Awarded 1-23-13 Completed 6-13-14, 88% Own forces
<br />City of Newport Beach, 100 Civic Center Dr., Newport Beach, CA 92660
<br />Mike Sinacorl, 949 644-3342
<br />On Call Services since 2015
<br />1. Vault Lid Repair, PCH and Dahlia, $7,910.00, 2-28-18
<br />2. Meter Vault, Cliff Drive, 511,598.00, 9-15-17
<br />3. Repaired 30" Line In Oil Fields, $60,928.00, 3-11-16
<br />4. Davit Sleeve Pad, City Yard, $6,972.00, 11-21-15
<br />5. V Ditch Repair, $16,512.00, 9-15-15
<br />92677
<br />Matt Crowl, 949 831-2500
<br />1. Repaired leaking water main, El Toro Rd, $65,973.00, 2-28-18
<br />2. Removed V Ditch, Installed flush outs, restored landscaping and
<br />street, Hillburst, $43,025.00, 9-30-17
<br />3. Diemer Pipeline Emergency Repair in SCRRA right of way,
<br />City of Anaheim, 200 South Anaheim Blvd., Anaheim, CA 92805
<br />Luis Tapia, 714 863-8020
<br />Alderdale Avenue and Maychelle Drive Transmission Main Replacement
<br />Project
<br />1,570' 8" PVC pipeline and appurtenances with restoration
<br />$469,744.00 Project Awarded 1-14-17 Completed 4-5-17
<br />City of Anaheim, 200 South Anaheim Blvd., Anaheim, CA 92805
<br />Tim Flint, 714 765A137
<br />Solomon Drive and Baja Drive Water Main Replacement Project
<br />9,000' 12" DIP pipeline and appurtenances with restoration
<br />$,917,035.00 Project Awarded 5-9-17 Completed 4-10-18 900/Own
<br />forces
<br />Upper San Gabriel Valley Municipal Water District In conjunction with
<br />San Gabriel Valley Water Company, 11142 Garvey Ave., El Monte, CA
<br />91732
<br />Matt Yucelen 626 448-6183
<br />South El Monte Recycled Waterline Project, Phase I Project
<br />13,000' 8-18" GWBR pipeline and appurtenances with restoration
<br />$1,770,047.00 (material provided( Project Awarded 9-15-15, Completed
<br />City of Ontario, 1425 S. Bon View Avenue, Ontario, CA 91761
<br />Omar Dandashl with NMC Builders LLC, 909 268-9918
<br />Francis Domestic Water Loop and Recycled Water Project
<br />Wet utilities for New Model Colony Housing Development, 30,000' 24-
<br />30" DIP water distribution system
<br />$10,702,107.00 Project Awarded 10-13-13, Completed 9-30-14, 85%