My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
T. E. ROBERTS, INC.
Clerk
>
Contracts / Agreements
>
T
>
T. E. ROBERTS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 12:23:40 PM
Creation date
9/4/2019 5:17:44 PM
Metadata
Fields
Template:
Contracts
Company Name
T. E. ROBERTS, INC.
Contract #
A-2019-142-03
Agency
PUBLIC WORKS
Council Approval Date
8/20/2019
Expiration Date
8/19/2022
Insurance Exp Date
9/1/2020
Destruction Year
2027
Document Relationships
TE ROBERTS, INC
(Amended By)
Path:
\Contracts / Agreements\T
TE ROBERTS, INC.
(Amended By)
Path:
\Contracts / Agreements\T
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />Roberts <br />INCORPORATED <br />uuu ......ruuu <br />HOURLY RATE SCHEDULES <br />T.E. Roberts, Inc. <br />City of Santa Ana <br />On -Call Emergency Water and Sewer Repair Services <br />President -Timothy Roberts <br />Project Managers -Justin Roberts, Gilbert Hartwell, Troy Lan <br />Superintendents- Dave Pope, Dave Klein, Bob Hartwell, <br />Francisco Romero, Javier Magana, Tom Zimprich <br />Hourly <br />Straight <br />Time <br />LABOR <br />Rates <br />Project Manager <br />$135.25 <br />Superintendent -Op Eng Gr 8 <br />$132.00 <br />Foreman -Operating Engineer Gr 8 <br />$127.12 <br />Foreman -Laborer Group 5 <br />$108.92 <br />Operator- Operating Engineer Gr 8 <br />$122.25 <br />Laborer- Laborer Group 1 <br />$100.80 <br />Pipe layer- Laborer Group 4 <br />$105.11 <br />Welder- Laborer Group 5 <br />$105.67 <br />Teamster- Teamster Group 3 <br />$97.35 <br />Materials <br />cost plus 15% <br />Bonds -if required <br />1.5% of total <br />SUBCONTRACTORS <br />Cost plus 10%for <br />Structures Unlimited -concrete structures <br />first $5,000, then <br />Penhall-sawcutting, concrete breaking <br />5%of amount over <br />Beard Electric -electrical <br />$5,000 <br />6/12/2019 <br />Hourly <br />EQUIPMENT <br />Rates <br />Large Excavator <br />$121.00 <br />Medium Excavator <br />$110.00 <br />Small Excavator <br />$99.00 <br />Back Hoe <br />$46.20 <br />Air Compressor w/JH <br />$22.00 <br />Dump Truck/Super10 <br />$49.50 <br />Pickup Truck or Van <br />$27.50 <br />Crew Truck <br />$33.00 <br />Flatbed Truck <br />$27.50 <br />Bed Trailer <br />$49.50 <br />Truck and Pup <br />$82.50 <br />Water Truck <br />$38.50 <br />Sweeper <br />$79.20 <br />Wheel Loader <br />$60.50 <br />Skip Loader <br />$44.00 <br />Skid Steer/Bobcat <br />$44.00 <br />Asphalt Zipper <br />$88.00 <br />Arrowboard <br />$16.50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.