My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PAULUS ENGINEERING, INC. (2)
Clerk
>
Contracts / Agreements
>
P
>
PAULUS ENGINEERING, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2021 2:25:36 PM
Creation date
9/4/2019 5:17:48 PM
Metadata
Fields
Template:
Contracts
Company Name
PAULUS ENGINEERING, INC.
Contract #
A-2019-142-02
Agency
PUBLIC WORKS
Council Approval Date
8/20/2019
Expiration Date
8/19/2022
Insurance Exp Date
5/1/2022
Destruction Year
2027
Document Relationships
PAULUS ENGINEERING, INC
(Amended By)
Path:
\Contracts / Agreements\P
PAULUS ENGINEERING, INC (2)
(Amended By)
Path:
\Contracts / Agreements\P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WILLEURRIS <br />214 N Myers St <br />Burbank, CA 91506 <br />714-514-3513 <br />wlllharrtsnR@a:gl,com <br />PROFESSIONAL EXPERIENCE: <br />ful_us lCs„npineering Inc. - Anaheim, CA 2014 to Present <br />Project Ranges: $500k - $5 Million <br />Project Manager/Estimator: Paulus Engineering is a medium size General Contractor <br />specializing in underground utilities and concrete work. My duties included <br />estimating and managing all the utility work. Work included water, storm drain, <br />sewer. <br />Marla Company - Change, CA <br />Project Ranges: $501c - $3 Million <br />Vice President Pipeline Division: Mark Company <br />Contractor specializing in underground utilities and <br />included estimating and managing all the utility work. <br />sewer and wet/dry utility installation. <br />2012 to 2014 <br />is a medium size General <br />concrete work. My duties <br />Work included storm drain, <br />WJ D.''C? sn traction - Burbank CA 2009 to 2012 <br />Project Ranges: $lk - $250k <br />Owner: Small Residential General Construction. Estimate & Manage, Build Projects <br />from Start to Finish. Bathroom/Kitchen Remodels, New Construction. <br />Kark Qmnany - Change, CA 2005 to 2009 <br />Project Ranges: $501c - $3 Million <br />General Manager/Project Manager/Estimator Pipeline Division: Mark Company is a <br />medium size General Contractor specializing in underground utilities and concrete <br />work. My duties included estimating and managing all the utility work. Work <br />included storm drain, sewer and wet/dry utility installation. <br />Griftlth Company - Sante Fe Springs, CA 2003 - 2005 <br />Project Ranges: $500k - $22 Million <br />Estimator/Superintendent for Heavy Utility Division: Estimated and Managed <br />W WTP upgrades and expansions. <br />Kxcel Paying C py4uy -Long Beach, CA 2000 - 2003 <br />Project Ranges: $100k - $85 Million <br />Project Manager/2stimator: Estimated and Managed various paving and utility <br />projects for multiple public agencies. Projects varied from alley upgrades to freeway <br />lane replacements. <br />Den Boer Engineering and Construction - Palm Springs, CA 1996 - 2000 <br />Project Ranges: $100k - $5 Million <br />Estimator/Superintendent: Estimated and Managed WWTP facility upgrades, lift <br />station construction and wet well station upgrades, <br />Calton Construction Company - Rialto, CA 1988 -1996 <br />Project Ranges: $500k - $5 Million <br />
The URL can be used to link to this page
Your browser does not support the video tag.