Laserfiche WebLink
N-2019-157 <br />MAYOR ir,ISURANCE NOT REQUIRED �- <br />Miguel A. Pulido <br />MAYOR PRO TEM <br />r'k, <br />INORK Iii PROCEED <br />Juan Villages <br />CLERK Of- COUNCIL <br />COUNCILMEMBERS' <br />Cecilia Iglesias <br />rr SLr' 4 qQ�p <br />0 G J <br />David Penaloza <br />4, <br />Vacant <br />Vicente Sarmiento <br />l� <br />Jose Solorio <br />o �wA'�r((�� CITY OF SANTA ANA <br />jL{f.p,) I J �titl Public Works Agency— Design Engineering <br />20 Civic Center Plaza, M-36 . P.O. Box 1988 <br />Santa Ana, California 92702 <br />www.santa-ana.oro <br />April 1, 2019 <br />ACTING CITY MANAGER <br />Steven Mendoza <br />CITY ATTORNEY <br />Sonia R. Caivalho <br />ACTING CLERK OF THE COUNCIL <br />Norma Mitre -Ramirez <br />AGREEMENT FOR PRELIMINARY ENGINEERING SERVICES <br />AND SUBMITTAL OF EXHIBIT "A" FOR RAILROAD APPROVAL <br />Crossing: Public: At -Grade <br />State: CA City: Santa Ana <br />MP: 519.10 Subdivision: Santa Ana Ind. Ld. <br />Warner Avenue DOT # 761248L <br />Orange County <br />Peggy Ygbuhay <br />Manager, Industry 8 Public Projects <br />Union Pacific Railroad Company <br />10031 Foothills Blvd. <br />Roseville, CA 95747 <br />Dear Ms. Ygbuhay: <br />Plans are being prepared to modify the existing at -grade crossing at the location referenced <br />above. The proposed work includes replacing existing entrance quad gates and flashers with <br />new quad gates with flashing light assembly (Standard 9) at their proposed locations due to <br />widening and realignment of Warner Ave. Exit quad gates with flasher assembly (Standard 9) is <br />added in the southeast quadrant and a flashing signal assembly (Standard 8) in the northwest <br />quadrant. Other improvements consist of new sidewalk and installing new crossing panels, <br />active cantilever warning signals (in southwest and northeast quadrants) and updates to <br />signage and striping in the crossing area. In connection with the project, the City of Santa Ana <br />(Agency) considers it necessary for the successful advancement of the project for your <br />company to collaborate in the development of the project by performing the following: <br />• preliminary engineering and other related services <br />• development of cost estimates <br />• review of the project's preliminary layouts <br />• submit current train and switching moves <br />SANTA ANA CITY COUNCIL <br />Miguel A. Pulido Juan vilegas Vicente Sarm ergo ! DaM Pensi Jose 3elodo ! Vacant I Cecilia Iglesias <br />Mayor Mayor No Tem. Ward 5 Wardt Ward i Word i Ward 1 Wei <br />MPUIdo/AsaMe one me JVllegasssano-ana or I VSarmiento4Dsante-ana oro DPenaion0sanlamaora i JSolaio(a�sanlaane.ao i Clalesias(Weii aana.ora <br />