My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RESO 2019-01_TPM 2017-02_200 E FIRST AMERICAN WAY
Clerk
>
Resolutions
>
ZONING ADMINISTRATORS
>
2019
>
RESO 2019-01_TPM 2017-02_200 E FIRST AMERICAN WAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2019 1:04:35 PM
Creation date
9/9/2019 1:04:21 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LS 01.16.19 <br />EXHIBIT A <br />Conditions of Approval <br />Tentative Parcel Map No. 2017-02 is approved subject to compliance, to the reasonable <br />satisfaction of the Planning Manager, with all applicable sections of the Santa Ana <br />Municipal Code, the California Administrative Code, the California Building Standards <br />Code and all other applicable regulations. <br />The Applicant must comply in full with each and every condition listed below prior to <br />exercising the rights conferred by this approval. <br />The Applicant must remain in compliance with all conditions listed below throughout the <br />life of the tentative parcel map. Failure to comply with each and every condition may <br />result in the revocation of the tentative parcel map. <br />1. Two copies of the recorded final parcel map shall be submitted each to the <br />Planning Division, Building Division and Public Works Agency within 10 <br />days of recordation. <br />2. The tentative parcel map, final map and all improvements required to be <br />made or installed by the subdivider shall be in accordance with the <br />requirements and design standards and specifications of the City of Santa <br />Ana Municipal Code and the requirements of the State Subdivision Map <br />Act. <br />3. After project occupancy, landscaping is to be maintained in accordance with <br />the landscape plan approved for the project. This shall include the <br />minimum levels of plant materials shown on the landscape plan and <br />installed at the time of occupancy. <br />4. Prior to issuance of a building permit for the first development on the <br />parcels, the Applicant shall submit for review and approval Conditions, <br />Covenants and Restrictions (CC&R's) for the project. At a minimum, the <br />CC&R's shall cover access, egress, drainage, and landscape maintenance. <br />5. Development within the area of the map is subject to development and <br />permit fees in effect at the time of permit issuance. <br />6. The project must be in compliance with the provisions of Development <br />Project ReviewlfPM (TPM No. 2017-02). <br />7. The property shall be maintained at all times. All weeds, debris and graffiti <br />shall be removed within 24 hours. Further, the perimeter fence shall be <br />maintained in a clean and sturdy condition. <br />Resolution No. 2019-01 <br />Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.