Laserfiche WebLink
LS 01.16.19 <br />2. The proposed project, as conditioned, conforms to all applicable <br />requirements of the zoning and subdivision codes as well as other <br />applicable City ordinances. <br />The proposed project, as conditioned, will conform to all applicable <br />requirements of the zoning and subdivision codes as well as other <br />applicable City ordinances. The proposed project, as conditioned, <br />conforms to the land use provisions of the zoning code that pertain <br />to lot size, lot frontage, landscaping, setbacks, lot coverage, and <br />parking. <br />3. The project site is physically suitable for the type and density of the <br />proposed project. <br />The project site is physically suitable for the type and density of the <br />proposed project. The proposed project consists of the <br />reconfiguration of five lots into two lots, with a new mid -rise office <br />building for the County of Orange to be built on Parcel 1. The <br />existing office buildings on Parcel 2 were designed and built to be <br />physically suitable for the site and are in compliance with all <br />applicable development standards of the zoning district. <br />4. The design and improvements of the proposed project will not cause <br />substantial environmental damage or substantially and avoidably injure fish <br />and wildlife or their habitat. <br />The design and improvements of the proposed project will not cause <br />substantial environmental damage or substantially and avoidably <br />injure fish and wildlife or their habitat. Since the project site is <br />located in an urbanized area, there are no known fish or wildlife <br />populations existing on the project site. Therefore, the proposed <br />subdivision will not cause any substantial environmental damage or <br />substantially and avoidably injure fish and wildlife or their habitat. <br />5. The design or improvements of the proposed project will not cause <br />serious public health problems. <br />The design or improvements of the proposed project will not cause <br />serious public health problems. The proposed subdivision will not <br />have any detrimental effects upon the general public. Each lot will <br />include the necessary utilities and infrastructure improvements as <br />required under Development Project Review/TPM No. 2017-03. <br />Resolution No. 2019-02 <br />Page 2 of 5 <br />