ACCT CST RSN
<br />PPE DESCRIPTION
<br />QTY/ST
<br />OF U/M
<br />CASH
<br />NONCASH
<br />OPER
<br />REMOVAL
<br />8 400
<br />SIGNALSHOPLABOR-CAP
<br />0.01
<br />0,0 MIT
<br />I
<br />^' LABOR SUBTOTAL
<br />1
<br />0
<br />0
<br />0
<br />*ADDITIVES
<br />DA OVERHEADS
<br />1
<br />* GANG SUBTOTAL
<br />SIGSHOP-IM - SIGNAL SHOP LABOR, I MAN
<br />2
<br />0
<br />0
<br />0
<br />1120 319 400
<br />9911
<br />ELECTRICAL MATERIAL
<br />1.00
<br />LS N
<br />1,500
<br />:'MATERIAL SUBTOTAL
<br />1,500
<br />0
<br />0
<br />0
<br />*ADDITIVES
<br />USBTAX
<br />129
<br />OFFLME TRANSPORTATION
<br />18
<br />*GANG SUBTOTAL
<br />ELECGANG-IM- ELECTRICAL GANG, I MAN
<br />1,647
<br />0
<br />0
<br />0
<br />8 400
<br />1037
<br />SIGNAL FIELD - REPLACE
<br />952.00
<br />0.0 MH
<br />24,949
<br />4,402
<br />*LABOR SUBTOTAL
<br />24,949
<br />0
<br />4,402
<br />0
<br />1120 313 400
<br />9911
<br />ARRESTOR, MDSA-2 XS
<br />1.00
<br />EA N
<br />697
<br />1120 313 400
<br />991l
<br />BATTERY, 20 VOL-255, 9 VGL-350
<br />1.00
<br />LS N
<br />6,763
<br />1120 313 400
<br />9911
<br />BELLS
<br />4.00
<br />EA N
<br />823
<br />1120 313 400
<br />9911
<br />BONDING MATERIAL
<br />1.00
<br />LS N
<br />500
<br />1120 313 400
<br />9911
<br />BUNGALOW 8X8 W/AC
<br />1.00
<br />LS N
<br />10,142
<br />1120 313 400
<br />9911
<br />BUNGALOW MATEMAL
<br />1,00
<br />LS N
<br />7,564
<br />1120 313 400
<br />9911
<br />CABLE, 2C/6 TW
<br />500,00
<br />FT N
<br />610
<br />1120 313 400
<br />9911
<br />CABLE, 3CR
<br />250.00
<br />FT
<br />1,458
<br />1120 313 400
<br />9911
<br />CABLE, 5010
<br />500.00
<br />FT N
<br />940
<br />1120 313 400
<br />9911
<br />CABLE, 5C/6
<br />1000.00
<br />FT N
<br />4,130
<br />1120 313 400
<br />9911
<br />CABLE, 7C/14
<br />1000.00
<br />FT N
<br />1,740
<br />1120 313 400
<br />9911
<br />CANTILEVER
<br />2.00
<br />EA N
<br />31,650
<br />1120 313 400
<br />9911
<br />CHARGERS, 12/80 (20/40/60)
<br />3.00
<br />EA N
<br />3,110
<br />1120 313 400
<br />9911
<br />CONDUIT, STEEL 4"
<br />200.00
<br />FT N
<br />3,064
<br />1120 313 400
<br />9911
<br />CONSTANT WARNING, XP4, ITK
<br />1.00
<br />EA N
<br />16,252
<br />1120 313 400
<br />9911
<br />EVENTRECORDER
<br />1.00
<br />EA N
<br />3,250
<br />1120 313 400
<br />9911
<br />FIELD MATERIAL
<br />1.00
<br />LS N
<br />7,372
<br />1120 313 400
<br />9911
<br />FILL DIRT
<br />20.00
<br />CY N
<br />500
<br />1120 313 400
<br />9911
<br />FOUNDATION, CANT
<br />2.00
<br />EA N
<br />6,636
<br />1120 313 400
<br />9911
<br />FOUNDATION, STEEL
<br />4.00
<br />EA N
<br />2,693
<br />1120 313 400
<br />9911
<br />GATE KEEPER
<br />4.00
<br />EA N
<br />6,668
<br />1120 313 400
<br />9911
<br />GATE MECHANISM, 5-60
<br />4,00
<br />EA N
<br />21,881
<br />1120 313 400
<br />9911
<br />HAWK 48DIM
<br />1.00
<br />RA
<br />1,930
<br />1120 313 400
<br />9911
<br />LED LIGHT
<br />28.00
<br />EA
<br />5,111
<br />1120 313 400
<br />9911
<br />LIGHT OUT DEFECTOR
<br />2.00
<br />EA
<br />1,926
<br />1120 313 400
<br />9911
<br />RELAY
<br />4.00
<br />EA N
<br />3,000
<br />1120 313 400
<br />9911
<br />SHUNT,NBS
<br />2.00
<br />EA N
<br />2,012
<br />1120 313 400
<br />9911
<br />SURFACE ROCK
<br />10.00
<br />CY N
<br />500
<br />* MATERIAL SUBTOTAL
<br />152,822
<br />0
<br />0
<br />0
<br />1120 367 400
<br />9911
<br />CONTRACT ENGINEERING
<br />1.00
<br />LS N
<br />8,000
<br />1120 399 400
<br />9911
<br />BUNGALOW, WIRE AND'FEST
<br />1.00
<br />LS N
<br />4,418
<br />1120 399 400
<br />9911
<br />DIRECTIONAL BORING
<br />300,00
<br />FT N
<br />15,000
<br />* OTHER SUBTOTAL
<br />27,418
<br />0
<br />0
<br />0
<br />*ADDITIVE'S
<br />PAYROLL ASSOCIATED COSTS
<br />16,309
<br />DA OVERHEADS
<br />27,076
<br />2,877
<br />4,7
<br />HQUIPMeNT EXPENSES
<br />5,548
<br />979
<br />INSURANCE EXPENSES
<br />4366
<br />770
<br />USE TAX
<br />13,146
<br />OPFLINE TRANSPORTATION
<br />1,911
<br />*GANG SUBTOTAL
<br />SIGFIELD-SM- SIGNAL FIELD LABOR, S MAN
<br />273,545
<br />0
<br />13,806
<br />0
<br />1120 410 400 9911
<br />AC POWER SERVICE
<br />1.00
<br />EA
<br />5,000
<br />"OTHER SUBTOTAL
<br />5,000
<br />p
<br />p
<br />0
<br />"GANG SUBTOTAL
<br />NONE -NO GANG NEEDED
<br />5,000
<br />0
<br />0
<br />0
<br />PROJECTSUBTOTAL
<br />CONTINGENCIES
<br />280,194
<br />0
<br />13,806
<br />0
<br />BILL PREPARATION FEE
<br />0
<br />0
<br />0ON
<br />2,802
<br />0
<br />138
<br />0
<br />PROJECT GROSS COST
<br />LESS COST PAIDBY OTHERS
<br />282,996
<br />0
<br />13,944
<br />0
<br />282,996
<br />0
<br />13,944
<br />0
<br />Page 2 of 5
<br />
|