Laserfiche WebLink
From:Leo Kim <br />To:Bernal, Sarah <br />Cc:Yoon Hee Choe; Gyoungje Park <br />Subject:Issue of Set Back at 301 and 325 N. Tustin <br />Date:Tuesday, September 03, 2019 9:44:35 AM <br />Dear Selena. <br />We are the owner of property (171 N Tustin) that shares property line with 301 and 305, and <br />we are subject to City ordinance of City of Tustin where as 301 and 305 is under City Santa <br />Ana. <br />Our business is Medical and Dental office. <br />The concerns we have is that 301 and 305 building proposal currently has 10 inch Set Back <br />from property line. That dictates there is only 10 inches in between our building wall to 301 <br />and 305 car washing tunnel wall. Within this tunnel there will be conveyor to carry cars, <br />numerous motors, mechanical brushes, high powered blowers, all related noises etc. <br />Our Medical and Dental equipment are delicately calibrated and highly sensitive to vibration. <br />Since we have only 10 inch Set Back without some type of buffering system in between our <br />buildings, subsequently our Medical and Dental practice will have to face and suffer level of <br />difficulties . we are requesting AT LEAST 24 inch Set Back which is mere 14 inch more than <br />currently proposed. <br />Yes we are aware of City Santa Ana has no limit on Set Back. So it could be right up to our <br />existing wall or 24 inches away. We would like to ask City Santa Ana to exercise it's <br />prudency <br />considering equitable benefits for both us and 301and 305. <br />Thank you very much. <br />Leo Kim <br />Dr. Yoon Hee Choi