My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA - SAN LORENZO
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/01/2019
>
20A - AA - SAN LORENZO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 7:45:57 PM
Creation date
9/27/2019 4:09:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20A
Date
10/1/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section S. Firm and Team Experience <br />Butler Engineering, Inc. <br />Butler Engineering Inc.'s focus as a firm is to <br />provide third -party construction management <br />services, a commitment we made to our <br />clients 42 years ago. Butler Is a Southern <br />California -based firm that services public <br />agencies, special districts, and the private <br />sector in the delivery of heavy civil <br />infrastructure. Our project expertise is in pump <br />stations, small and large diameter pipelines, <br />Flow control facilities, water production wells, <br />water/wastewater treatment facilities, <br />reservoirs, and water quality laboratories. <br />Representative clients include, but are not <br />limited to, the following: <br />■ Chino Basin DesalterAuthority <br />• Cities of Tustin, Anaheim, San Juan <br />Capistrano, Newport Beach, Huntington <br />Beach, Carlsbad, Escondido, and Vista <br />• County of Orange <br />• East Orange County Municipal Water District <br />• Irvine Ranch Water District <br />• Mesa Water District <br />• Metropolitan Water District of S. California <br />■ Orange County Sanitation District <br />• Orange County Water District <br />• San Bernardino Valley MWD <br />• San Diego County Water Authority <br />• Santa Margarita Water District <br />• South Coast Water District <br />■ South Orange County Wastewater Authority <br />• Water Replenishment District of S. California <br />■ West Basin Municipal Water District <br />Key Personnel <br />Butler Engineering, Inc.'s team consists of 35 <br />skilled project managers, schedulers, <br />estimators, and inspectors who have <br />successfully managed water/wastewater <br />treatment, storage, and transmission projects <br />throughout Southern California The <br />Construction Management Team is a key link <br />to a successful project. By having the Butler <br />Team serve the City as a single -source of <br />responsibility, the CM and Inspection activities <br />will be well coordinated and delivered <br />efficiently. In addition to our licensed <br />professional engineers, our field engineering <br />staff possess certifications from the following <br />organizations: <br />• American Concrete Institute (Field Testing <br />Technicians) <br />• American Welding Society(Certified Welding <br />Inspectors) <br />• International Code Council (Reinforced <br />Concrete, Prestressed Concrete, Structural <br />Masonry, Soils, Spray -Applied Fireproofing, <br />Structural Steel And Bolting, Structural <br />Welding, Electrical) <br />■ NACE International (Level 1, 2 and 3 Certified <br />Coating Inspectors) <br />• Post Tension Institute (Field Technicians) <br />Approach to Managing Personnel <br />We propose to approach this project with a <br />spirit of partnership. This enables us to <br />combine the knowledge, ideas, and talents of <br />your staff with our construction administration <br />experience. Our core team will be <br />supplemented by as -needed technical and <br />administrative resources provided by Butler. <br />Butler's CM and inspection responsibilities are <br />handled by the project team member best <br />experienced to provide the needed service. <br />Butler does not assign inspection staff to <br />perform project document controls; rather, <br />inspectors focus on implementing the QA/QC <br />program and reports required to document <br />daily activity. Likewise, all project <br />documentation and controls are the <br />responsibility of the Contract Administrator. All <br />projects have a Project Manager assigned to <br />monitor project field staff performance. <br />Following this formula is critical for the <br />Owner's defense in the event of project <br />claims. It is also more cost efficient by <br />matching staff skills to project needs. <br />The Project Director has full access to teams <br />of civil, mechanical, electrical, and structural <br />engineers, specialty consultants, and <br />inspectors through existing relationships and <br />teaming arrangements with local firms. The <br />CM Team is always vigilant during <br />preconstruction, construction, and close-out to <br />meticulously document project activities and <br />minimize contractor claims. <br />41 A A <br />
The URL can be used to link to this page
Your browser does not support the video tag.