Laserfiche WebLink
BUTIER <br />{:msvun.'"n M1id,a�pa�. Conruinny En yrnaem <br />Vladimir Burce, P.E. <br />Technical Advisor <br />EDUCATION <br />Professional Summary <br />Ms., construction <br />Management, University of <br />Mr, Burce is a registered civil engineer with over 23 ears of professional <br />9 9� Y <br />Southern California, Los <br />experience In project and construction management, Including planning, <br />Angeles, California, 2003 <br />design, resource allocation, and costtschedule management of major projects. <br />He has extensive experience in providing PM and CM services for <br />Bs., Civil Engineering, <br />stateono, Polytechnic <br />water/wastewater treatment facilities, wells, um stations, storm water <br />University <br />university -Pomona, <br />detention / retentions stems, transportation, parking structures, industrial, <br />y P P 9 <br />California, 1995 <br />educational, residential, and land development projects during the design and <br />construction phases. <br />LICENSES/ <br />CERTIFICATIONS <br />Mr. Burce has diverse project experience in public works and real estate <br />P 1 P <br />professional Civu Engineer: <br />development. This background provides him with an In-depth understanding <br />California (CE59405) <br />of civil engineering disciplines. His professional responsibilities have ranged <br />from feasibility study, geotechnical, civil design, complex drainage design and <br />AFFILIATIONS <br />regulatory requirements, technical spec'Ifications development and preparation <br />Woject Management Institute <br />of bid documents, designlconstructability review, schedule preparation, field <br />Building industry Association, <br />implementation and supervision, and construction management. <br />Orange county chapter <br />Relevant Experience <br />Urban Land institute <br />Resident Engineer, Mid -Basin Injection: Centennial Park Project; Santa <br />YEARS WITH FIRM <br />Ana, CA; Orange County Water District (Completion: 2018; Value: $23.2 <br />3 years <br />million) --The Mid -Basin Injection project consists of the construction of the <br />following: four groundwater injection wells in below grade vaults; a monitoring <br />AVAILABILITY <br />well at the Heritage Museum site; a purified recycled water injection supply <br />As Needed <br />pipeline approximately 5,000 feet long that connects to the District's existing <br />Groundwater Replenishment System (GW RS) pipeline and crosses the Santa <br />Ana River; a backflush discharge pipeline approximately 4,000 feet long that <br />discharges to the Greenville -Banning Channel and Centennial Park Lake; <br />Installation of submersible pumps within the four Injection wells; replacement <br />of approximately 9.6 acres of paving within the Park; demolishing an existing <br />City of Santa Ana restroom facility; and constructing two new buildings with <br />shared City and District uses. Mr. Burce is coordinating closely with the City <br />of Santa Ana, Santa Ana Unified School District, Heritage Museum, and state <br />and federal agencies. <br />Resident Engineer, Chino II Well Field Equipping of Raw Water Wells <br />Nos. 11-10 and 11.11; Eastvale and Ontario, CA; (Chino Basin Desalter <br />Authority (Completion: 2017; Value: $3.8 milllon)—Mr. Burce provided <br />resident engineering services for Well Nos. II-10 and II-11. Well II-10 is <br />located on CDA property in the City of Eastvale within Riverside County. Well <br />II-11 (Lot "A") is located on CDA property in the City of Ontario within San <br />Bernardino County. The scope of work included equipping of two water wells <br />including, but not limited to, the following: construction of 168" W x 41'4"L x <br />16"H reinforced masonry block building; Installation of 3,300 gpm vertical <br />turbine stainless steel pumping unit and 600 hp premium efficiency motor, <br />16-inch diameter epoxy lined steel discharge header pipe, 12-inch diameter <br />pump to waste piping, 16-inch diameter flow meter, site pressure piping and <br />tubing, valves, taps and Corp stops, pressure gages, 16-inch diameter C905 <br />PVC underground discharge pipeline, and connection to existing 24-inch <br />20A-54 <br />