<br />{:msvun.'"n M1id,a�pa�. Conruinny En yrnaem
<br />Vladimir Burce, P.E.
<br />Technical Advisor
<br />EDUCATION
<br />Professional Summary
<br />Ms., construction
<br />Management, University of
<br />Mr, Burce is a registered civil engineer with over 23 ears of professional
<br />9 9� Y
<br />Southern California, Los
<br />experience In project and construction management, Including planning,
<br />Angeles, California, 2003
<br />design, resource allocation, and costtschedule management of major projects.
<br />He has extensive experience in providing PM and CM services for
<br />Bs., Civil Engineering,
<br />stateono, Polytechnic
<br />water/wastewater treatment facilities, wells, um stations, storm water
<br />University
<br />university -Pomona,
<br />detention / retentions stems, transportation, parking structures, industrial,
<br />y P P 9
<br />California, 1995
<br />educational, residential, and land development projects during the design and
<br />construction phases.
<br />LICENSES/
<br />CERTIFICATIONS
<br />Mr. Burce has diverse project experience in public works and real estate
<br />P 1 P
<br />professional Civu Engineer:
<br />development. This background provides him with an In-depth understanding
<br />California (CE59405)
<br />of civil engineering disciplines. His professional responsibilities have ranged
<br />from feasibility study, geotechnical, civil design, complex drainage design and
<br />AFFILIATIONS
<br />regulatory requirements, technical spec'Ifications development and preparation
<br />Woject Management Institute
<br />of bid documents, designlconstructability review, schedule preparation, field
<br />Building industry Association,
<br />implementation and supervision, and construction management.
<br />Orange county chapter
<br />Relevant Experience
<br />Urban Land institute
<br />Resident Engineer, Mid -Basin Injection: Centennial Park Project; Santa
<br />YEARS WITH FIRM
<br />Ana, CA; Orange County Water District (Completion: 2018; Value: $23.2
<br />3 years
<br />million) --The Mid -Basin Injection project consists of the construction of the
<br />following: four groundwater injection wells in below grade vaults; a monitoring
<br />AVAILABILITY
<br />well at the Heritage Museum site; a purified recycled water injection supply
<br />As Needed
<br />pipeline approximately 5,000 feet long that connects to the District's existing
<br />Groundwater Replenishment System (GW RS) pipeline and crosses the Santa
<br />Ana River; a backflush discharge pipeline approximately 4,000 feet long that
<br />discharges to the Greenville -Banning Channel and Centennial Park Lake;
<br />Installation of submersible pumps within the four Injection wells; replacement
<br />of approximately 9.6 acres of paving within the Park; demolishing an existing
<br />City of Santa Ana restroom facility; and constructing two new buildings with
<br />shared City and District uses. Mr. Burce is coordinating closely with the City
<br />of Santa Ana, Santa Ana Unified School District, Heritage Museum, and state
<br />and federal agencies.
<br />Resident Engineer, Chino II Well Field Equipping of Raw Water Wells
<br />Nos. 11-10 and 11.11; Eastvale and Ontario, CA; (Chino Basin Desalter
<br />Authority (Completion: 2017; Value: $3.8 milllon)—Mr. Burce provided
<br />resident engineering services for Well Nos. II-10 and II-11. Well II-10 is
<br />located on CDA property in the City of Eastvale within Riverside County. Well
<br />II-11 (Lot "A") is located on CDA property in the City of Ontario within San
<br />Bernardino County. The scope of work included equipping of two water wells
<br />including, but not limited to, the following: construction of 168" W x 41'4"L x
<br />16"H reinforced masonry block building; Installation of 3,300 gpm vertical
<br />turbine stainless steel pumping unit and 600 hp premium efficiency motor,
<br />16-inch diameter epoxy lined steel discharge header pipe, 12-inch diameter
<br />pump to waste piping, 16-inch diameter flow meter, site pressure piping and
<br />tubing, valves, taps and Corp stops, pressure gages, 16-inch diameter C905
<br />PVC underground discharge pipeline, and connection to existing 24-inch
<br />20A-54