My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA - SAN LORENZO
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/01/2019
>
20A - AA - SAN LORENZO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 7:45:57 PM
Creation date
9/27/2019 4:09:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20A
Date
10/1/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUTIER <br />Gonttmrnnn Ndnnymy. FoneulYep Enylnaerx <br />Bryan Wilson <br />Contract Administrator <br />Professional Summary <br />EDUCATION <br />Mr. Wilson has over 18 years of construction estimating, cost review, <br />B.S., Engineering <br />inspection, and engineering management experience. He has analyzed and <br />Technology —Construction, <br />reviewed cost estimates for hundreds of projects ranging from underground <br />California State Polytechnic <br />pipelines to high-rise office buildings. These projects involved the training and <br />University, Pomona, 2000 <br />management of engineers and estimators to determine and track construction <br />AREAS OF <br />costs and activities. Mr. Wilson's detailed estimating experience covers all <br />aspects of building and heavy/civil design and construction, including <br />EXPERTISE <br />earthwork, structural, mechanical, electrical, and plumbing components. He <br />CPM Project Scheduling <br />has conducted numerous physical inspections in order to verify the accuracy <br />Cost Control <br />and scope of quantities and cost estimates derived from construction <br />Quality control <br />blueprints. He also has experience in organizing and tracking requests for <br />Construction a Specialty <br />information (RFI), project scheduling, negotiating construction change orders, <br />Trade Estimating <br />and value engineering analyses. <br />Cost valuation <br />Mr. Wilson's range of professional experience Includes working for and with <br />Value Engineering <br />construction management firms, general contractors, architecture and <br />engineering firms, and public accounting and consulting firms. He has also <br />Construction Inspections <br />provided asset valuation and classification consulting services to real estate <br />Surveying <br />appraisers and construction companies. He has prepared construction cost <br />Structural Design <br />estimate studies for federal tax depreciation classification and successfully <br />Change order Negotiation <br />defended these studies when audited by the Internal Revenue Service, <br />Cost Segregation Studies <br />Project Experience <br />Project Organization <br />Engineering Management <br />Field Engineer/Document Control Specialist, Mid -Basin Injection: <br />Centennial Park Project; Santa Ana, CA; Orange County Water District <br />owner Presentations <br />(Completion: 2018; Value: $23.2 million) —Mr. Wilson is performing as the <br />Project Review <br />Document Control Specialist for the Mid -Basin Injection project, which <br />consists of the construction of the following: four groundwater injection wells <br />YEARS WITH FIRM <br />in below grade vaults, including all related appurtenances within Centennial <br />4yea ra <br />Park; a monitoring well at the Heritage Museum site; a purified recycled water <br />injection supply pipeline approximately 5,000 feet long that connects to the <br />AVAILABILITY <br />District's existing Groundwater Replenishment System (GWRS) pipeline and <br />20% <br />crosses the Santa Ana River; a backf€ush discharge pipeline approximately <br />4,000 feet long that discharges to the Greenville -Banning Channel and <br />Centennial Park Lake; installation of submersible pumps within the four <br />injection wells; replacement of approximately 9.6 acres of paving within the <br />Park; demolishing an existing City of Santa Ana restroom facility; and <br />constructing two new buildings with shared City and District uses. Mr. Burce <br />is coordinating closely with the City of Santa Ana, Santa Ana Unified School <br />District, Heritage Museum, and state and federal agencies. <br />Field Engineer/Assistant Resident Engineer, Santa Ana River Enhanced <br />Recharge Phase 1A Sedimentation Basin and Pipeline; San Bernardino <br />Valley Municipal Water District (Est. Completion: 2018; Value: $14 <br />million)---Butier (Prime) and GHD (Sub) are providing design, engineering, <br />and CM services for the SARER Phase 1A project, which is located in an <br />undeveloped area near the upper reaches of the Santa Ana River. A new <br />diversion structure and inlet channel is being constructed to divert water to <br />20A-58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.