My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA - SAN LORENZO
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/01/2019
>
20A - AA - SAN LORENZO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 7:45:57 PM
Creation date
9/27/2019 4:09:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20A
Date
10/1/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
These sections define requirements and <br />procedures for checking, reviewing, distributing, <br />tracking, and controlling documents for QA/QC. <br />The project specific QA1OC Plan will be <br />submitted and reviewed by the City prior to <br />submittal of other project deliverables. The <br />individuals performing QA/QC reviews will be <br />clearly indicated in the project organization <br />chart. Deliverables will contain a statement that <br />the information contained In the submittal has <br />been quality control checked in accordance with <br />the QAiQC Plan. <br />Quality Assurance is the confirmation <br />process that all procedures directing the work <br />have been developed and followed and any <br />corrective actions required have been <br />implemented. Procedures or actions to be <br />confirmed include: <br />Construction management plan; <br />• Training of staff in QA/QC requirements; <br />• Submittal process plan; <br />• Document control plan; <br />Identification of City approvals at <br />appropriate milestones; <br />• Control of testing to determine validity and <br />accuracy of data collected in the field; <br />• Calibration and testing of equipment; <br />• Identification of the need for corrective <br />action; and <br />• Audit to verify compliance with the QA/QC <br />Plan, <br />Quality Control is the actual checking and <br />validation of the inputs and outputs of the <br />work. Activities to be verified for the work <br />include the following: <br />• Review by quality control team; <br />• Identification and compliance with <br />applicable codes, ordinances, permits, <br />environmental requirements, etc.; <br />• Review input data and check calculations; <br />City of Santa Ana, Public Works Agency <br />Construction Engineering Services for the <br />San Lorenzo Sewage Lift Station, RFP No. 16-049 <br />• Review drawings, specifications, technical <br />reports, memos, meeting minutes; <br />• Perform constructability, operability, <br />maintainability, and usability reviews; and <br />• Review design for compliance with safety <br />standards. <br />The Principal -In -Charge and Project Manager <br />will prepare a specific CM Communications <br />Manual for the San Lorenzo Sewage Lift <br />Station Project to be approved by the City. <br />The manual will Include project <br />correspondence and other forms of <br />communication In accordance with the City's <br />documentforrnatting standards. The manual <br />will integrate the interdependent roles of the <br />City, Construction Manager, Design Engineer, <br />and the Contractor, through pre -construction, <br />mobilization, construction, and acceptance of <br />the phases of the work. The Communication <br />Manual will include the following: <br />Project Organization: Individual <br />assignments, responsibilities, phone <br />numbers, lines of communication, and <br />methods for interfacing with the City, <br />project stakeholders, and the Contractor. <br />Organization chart showing relationships <br />between the parties. <br />• Project Control. Description of cost, <br />schedule and document control systems. <br />• Communication Management: <br />Procedures for documenting <br />communications and correspondence; <br />distribution and/or routing lists; and <br />examples of all forms that the Contractor <br />will be required to use. <br />• Meeting/Notice Procedures: <br />Schedules, notices, agendas, reporting <br />procedures, documentation requirements, <br />and timely acceptance processes. <br />• QA/QC: Procedures, laboratory testing, <br />field-testing, coordination checks, and <br />HILITIER C. UNDERSTANDING OF NEED <br />20A-62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.