My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA - SAN LORENZO
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/01/2019
>
20A - AA - SAN LORENZO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 7:45:57 PM
Creation date
9/27/2019 4:09:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20A
Date
10/1/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana, Public Works Agency <br />Construction Engineering Services for the <br />San Lorenzo Sewage Lift Station, RFP Ala 2-049 <br />Safety ❑ <br />Attend Contractors weekly safety <br />❑ <br />Illness and injury free <br />meeting. Follow and respect <br />construction site. <br />Contractor's safety program. <br />❑ <br />Maintain a safe working <br />❑ <br />Observe for testing of the quality <br />environment in confined space <br />of air In confined spaces and the <br />❑ <br />Prevent leakage of odors and <br />provision of a fresh air source. <br />explosive gasses. Provide for a <br />❑ <br />Inspect HVAC duct connections, <br />hazard free environment. <br />pipe joints, door/hatch seals, <br />❑ <br />Provide a safe environment for <br />penetration seals and equipment <br />operation and maintenance of the <br />seals for tightness and longevity. <br />pump station. <br />❑ <br />Ensure HVAC system is installed <br />❑ <br />Facility is provided with <br />where the fresh air source Is <br />unobstructed lighting for safety <br />unobstructed and unadulterated. <br />and ease of operation and <br />❑ <br />Inspect to see that all electrical <br />maintenance. <br />equipment is properly grounded, <br />all switches are the non -spark type <br />and hazardous areas are <br />equipped with explosion proof <br />fixtures, switches, boxes, oudets. <br />Environmental Impacts <br />Structural Failures <br />Drive & Pump Shaft <br />Longevity of Materials <br />Compliance <br />Traffic Control <br />Pump Station and Pipeline <br />Alignment <br />❑ Verify all light sources are installed <br />in a location to provide required <br />lumens for operation personnel. <br />❑ Enforce hours of work, raise <br />levels, and clean work areas. <br />❑ Require whisper quiet equipment <br />for 24-hour dewatering operations <br />and emergency numbers for <br />Contractor to address <br />abnormalities. <br />❑ Inspect all structural components <br />such as concrete, pump base <br />plates and other equipment <br />supports for level and plumb. <br />❑ Require proper alignment using <br />millwright(s) for drive and pump <br />shaft alignment. <br />❑ Provide a pump Installation within <br />the manufacturer's requirement. <br />❑ Insist the Contractor follow the <br />requirement for corrosion resistant <br />materials during construction. <br />❑ Enforce Best Management <br />Practices (BMP) for site drainage <br />and eliminate runoff. <br />❑ Minimize environmental impacts <br />to the local community. <br />❑ Minimize community complaints <br />and possible complications from <br />spills or interruption of dewatering <br />operation. <br />❑ Prevent minor structural failures <br />that can cause pumps and other <br />equipment to run inefficiently <br />causing noise vibration and wear. <br />❑ Will provide full warranty <br />performance. <br />❑ Increase longevity of the Pump <br />Station and pipeline. <br />❑ Maintain compliance with all <br />regulatory agencies. <br />❑ Monitor and enforce traffic control ❑ Maintain maximum traffic flow <br />plans for Sergerstrom Avenue. and workers safety. <br />❑ Check Pump Station and Pipeline <br />alignment and depth during <br />construction. <br />❑ Provide working hydraulic profile <br />as designed for properly <br />functioning facilities. <br />13UTIEIR C. UNDERSTANDING OF NEED <br />20A-65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.