My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA - SAN LORENZO
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/01/2019
>
20A - AA - SAN LORENZO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 7:45:57 PM
Creation date
9/27/2019 4:09:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20A
Date
10/1/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Page 3 <br />San Lorenzo Sewage Lift Station (06-3510), bidding on July 9, 2019 2:00 PM <br />(Pacific) <br />Printed 08/15/2019 <br />Bid Results <br />Type <br />Item Code UOM <br />Qty <br />Unit Price <br />Line Total Comment <br />19 <br />Provide and Maintain Traffic Control <br />LS <br />1 <br />$50,000.00 <br />$50,000.00 <br />20 <br />Prepare and Implement Stormwater Pollution Prevention Plan <br />LS <br />1 <br />$20,000.00 <br />$20,000.00 <br />21 <br />Removal of Existing Median/Landscaping, Construct Temporary Pavement including Re -striping, and Replacement of Median and <br />Landscaping <br />LS <br />1 <br />$130,000.00 <br />$130,000.00 <br />22 <br />Removal and Replacement of Concrete Bus Pad <br />LS <br />1 <br />$30,000.00 <br />$30,000.00 <br />23 <br />Removal and Replacement of Curb, Gutter, Sidewalk and Medians <br />LS <br />1 <br />$18,000.00 <br />$18,000.00 <br />24 <br />Replacement of Traffic Lopps, Detectors and Wiring <br />LS <br />1 <br />$15,000.00 <br />$15,000.00 <br />25 <br />Construct Grind and ARHM Overlay <br />SF <br />44000 <br />$2.25 <br />$99,000.00 <br />26 <br />Furnish and Install Final Striping and Replacement of Pavement Markings <br />LS <br />1 <br />$15,000.00 <br />$15,000.00 <br />27 <br />TV Inspection of Gravity Sewer Mains <br />LS <br />1 <br />$5,000.00 <br />$5,000.00 <br />28 <br />Potholing <br />LS <br />1 <br />$50,000.00 <br />$50,000.00 <br />29 <br />Over -Excavation and Subgrade Stabilization of Trenches' <br />CY <br />100 <br />$225.00 <br />$22,500.00 <br />30 <br />Construction Staking <br />LS <br />1 <br />$30,000.00 <br />$30,000.00 <br />31 <br />Start-up, Testing and Training <br />LS <br />1 <br />$15,000.00 <br />$15,000.00 <br />32 <br />As -Built Plans, O&M Manuals and Warranties <br />LS <br />1 <br />$5,000.00 <br />$5,000.00 <br />33 <br />Permits <br />LS <br />1 <br />$20,000.00 <br />$20,000.00 <br />34 <br />Labor Agreement Oversight <br />LS <br />1 <br />$10,000.00 <br />$10,000.00 <br />PlanetBids, Inc. <br />20A-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.