Laserfiche WebLink
Notes <br />Quote is based on: <br />• Shipment of entire project together to one location <br />• 48D Volt, 3 Phase electrical system requirement, to be confirmed prior to production <br />• Structural code and wind ,peed = 2016 CBC„ L10 mph, Exposure C. <br />• Confirmation of pole locations prior to production. <br />• The owner of the field Is responsible for the structural integrity of the existing poles. <br />Thank you for considering Musco for your lighting needs. Please contact me with any questions or if you need additional <br />details. <br />Mike Marchetti <br />Musco Sports Lighting, LLC <br />3002 Dow Ave., 0504 <br />Tustin, CA 92780 <br />Phone, 949-754-0503 x6111 <br />E-mail: mlke.rttarchetti@musco.corn <br />„swt« gr�o�q ere <br />20B-21 <br />