Laserfiche WebLink
City of Santa Ana <br />Page 2 <br />Bristol <br />Street Rehabilitation from 17th St to Santa Clara Ave (18-6909), bidding on July 9, 2019 2:00 PM (Pacific) <br />Printed 08/26/2019 <br />Bid Results <br />Type <br />Item Code <br />UOM <br />City <br />Unit Price <br />Line Total Comment <br />3 <br />Cold Mill (2") <br />SF <br />8600 <br />$0.35 <br />$3,010.00 <br />4 <br />Cold Mill (3") <br />SF <br />114000 <br />$0.25 <br />$28,500.00 <br />5 <br />Asphalt Rubber Hot Mix (ARHM) <br />TN <br />1400 <br />$85.00 <br />$119,000.00 <br />6 <br />Asphalt Rubber Aggregate Membrane (ARAM) <br />SY <br />13800 <br />$7.50 <br />$103,500.00 <br />7 <br />FCC Sidewalk (4") <br />SF <br />600 <br />$6.40 <br />$3,840.00 <br />8 <br />PCC Curb Ramp <br />SF <br />4100 <br />$11.50 <br />$47,150.00 <br />9 <br />PCC Curb and Gutter (Type A-2-8) <br />SF <br />100 <br />$38.00 <br />$3,800.00 <br />_ 10 <br />Cross -Gutter (Arterial Street) <br />_ <br />LF <br />2200 <br />$11.50 <br />$25,300.00 <br />11 <br />Concrete Bus Pad <br />SF <br />1100 <br />$15.00 <br />$16,500.00 <br />-- - _ - 12--- <br />Adjust Water Valve Frame and Cover to Finished <br />Grade <br />SF <br />10 <br />$1,000.00 <br />$10,000.00 <br />13 <br />Adjust Sewer and Drainage Manhole to Finished Grade <br />EA <br />7 <br />$1,000.00 <br />$7,000.00 <br />14 <br />Furnish and Install #6 Pullbox <br />EA <br />12 <br />$700.00 <br />$8,400.00 <br />15 <br />Adjust Survey Monument to Finished Grade <br />EA <br />3 <br />$1,000.00 <br />$3,000.00 <br />16 <br />Furnish and Install Traffic Loops Dt <br />EA <br />12 <br />$240.00 <br />$2,880.00 <br />17 <br />Furnish and Install Traffic Loops Et <br />EA <br />31 <br />$220.00 <br />$6,820.00 <br />18 <br />Construction Sign <br />EA <br />2 <br />$800.00 <br />$1,600.00 <br />