My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - BRISTOL ST REHAB
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/01/2019
>
23A - PROJ - BRISTOL ST REHAB
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 7:48:04 PM
Creation date
9/27/2019 4:09:12 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
10/1/2019
Destruction Year
2024
Document Relationships
R.J. NOBLE COMPANY (3)
(Message)
Path:
\Contracts / Agreements\ PROJECTS
ROCKFORCE CONSTRUCTION, LLC
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 18-6909 <br />BRISTOL REHABILITATION FROM 17TM ST TO SANTA CLARA AVE <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: R.J. NOBLE COMPANY <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Unclassified Excavation <br />230 <br />CY <br />S <br />S <br />125.00 <br />1-8 750.00 <br />2 <br />AC Pavement <br />900 <br />TN <br />S <br />$ <br />85.00 <br />76,500.00 <br />3 <br />Cold Mill (2") <br />8,600 <br />SF <br />$ <br />S <br />0.35 <br />3,010.00 <br />4 <br />Cold Mill (3") <br />114,000 <br />SF <br />S <br />S <br />0.25 <br />2&500.00 <br />5 <br />Asphalt Rubber Hot Mix (ARHM) <br />1,400 <br />TN <br />S <br />S <br />85.00 <br />119,000.00 <br />6 <br />Asphalt Rubber Aggregate Membrane <br />13,900 <br />SY <br />$ <br />E <br />(ARAM) <br />7.50 <br />103,500.00 <br />7 <br />PCC Sidewalk (4") <br />600 <br />SF <br />S <br />$ <br />6.40 <br />3,840.00 <br />8 <br />PCC Curb Ramp <br />4,100 <br />SF <br />S <br />$ <br />11.50 <br />47,150.00 <br />9 <br />PCC Curb and Gutter (Type A-2-8) <br />100 <br />LF <br />$ <br />E <br />38.00 <br />3,800.00 <br />10 <br />Cross -Gutter (Arterial Street) <br />2,200 <br />SF <br />$ <br />S <br />11.50 <br />25,300.00 <br />11 <br />Concrete Bus Pad <br />1,100 <br />SF <br />$ <br />S <br />15.00 <br />16,500.00 <br />12 <br />Adjust Water Valve Frame and Cover to <br />10 <br />EA <br />$ <br />S <br />Finished Grade <br />1,000.00 <br />10,000.00 <br />13 <br />AdjustSewer and DrainageManhole to <br />7 <br />EA <br />$ <br />$ <br />Finished Grade <br />Furnish and Install #6 Pullbox <br />1,000.00 <br />7,000.00 <br />14 <br />12 <br />EA <br />$ <br />$ <br />700.00 <br />8,400.00 <br />P-1 of P-16 <br />23A-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.