My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25D - AGMT - PAVEMENT MGNT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/01/2019
>
25D - AGMT - PAVEMENT MGNT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 7:49:50 PM
Creation date
9/27/2019 4:09:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25D
Date
10/1/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Pavement Management Program Update RFP No. 19-070 <br />August 6, 2019 <br />NCE will next perform a Budget Needs analysis using an <br />analysis period to be determined by the City (assumed to be <br />seven years per the RFP, although this can be as long as 30 <br />years). This will identify M&R requirements for each road <br />section and determines the total maintenance and <br />rehabilitation requirements over the entire analysis period. The <br />Needs Analysis identifies road sections that need treatment <br />and applies the M&R decision tree to each section. The costs <br />are then summed for the entire period. This forms the basis for <br />performing Budget Scenario evaluations, which optimize the <br />street sections for repair under constrained budgets. <br />In simple terms, the Budget Needs analysis answers the questions: <br />"If unlimited funding is available for street maintenance and repair, which streets should the City fix?" <br />"When should the City fix them?" <br />"What treatments should the City apply?" <br />"How much will it cost?" <br />The Budget Scenarios evaluation prioritizes sections for repair under constrained, realistic, budgetary <br />assumptions. <br />This module answers the question: <br />"If the City has only limited funds for street maintenance and repair, which streets have the highest priority for repairs, <br />when should the City perform the repairs, and how much will it cost?" <br />Multiple budget or target -driven scenarios will be performed after discussion with City staff. Examples of <br />typical scenarios include: <br />l Impacts of existing funding levels <br />¢0 Impacts to model drops in funding, e.g. drop in Measure M revenues if a recession occurs <br />s° Forecast PCI's for all sections for seven years <br />4' Funding required to maintain certain PCI levels (as per OCTA requirements) <br />e1 Funding analyses by community or maintenance zone <br />NCE will then prepare a final report that summarizes the overall condition of the City's pavement network, <br />the M&R strategies used by the City, the results of budgetary analyses, and different budget scenarios and <br />recommendations on the recommended scenario with selected road sections for maintenance and <br />rehabilitation. In addition to the City's requirements, this report will meet OCTA's Measure M2 <br />reauirements, as outlined by the OCTA PMP Template. <br />Page 121 <br />25D-34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.